PREV TOC HOME INDEX NEXT


Table of Contents

1. About UDD

1.1. System Requirements
1.2. Supported Boards
1.3. User Interface Considerations

2. Before You Begin

2.1. Installing UDD
2.2. Verifying Board Configuration Data
2.3. Preparing to Start UDD
2.4. Starting UDD
2.4.1. Startup Message
2.4.2. Error Messages

3. Using the UDD Utility

3.1. Using the UDD Utility
3.2. Board Information
3.3. Menu Options
3.4. Button Options
3.5. Generating a Log File
3.6. Selecting a Board
3.7. Specify Tests
3.8. Run the UDD Tests
3.9. Abort Tests
3.10. Monitoring Test Status
3.11. Ending a UDD Session

4. UDD Test Descriptions

4.1. Board Sanity Check
4.2. Shared RAM Test
4.3. Local RAM Test
4.4. DSP Test
4.5. Board Timer Test
4.6. Onboard Interrupt Test
4.7. SC2000 Test
4.8. EEPROM Test
4.9. PC Interrupt Test
4.10. T1 Loopback Test
4.11. E1 Loopback Test
4.12. LS Frontend Test
4.13. NS Hardware Test

5. Troubleshooting

5.1. Troubleshooting Checklist

6. The Return Material Authorization (RMA) Process

6.1. Before You Call
6.2. Contacting Dialogic
6.3. Returning the Board and Test Results

Copyright notice

Index


PREV TOC HOME INDEX NEXT

Click here to contact Dialogic Customer Engineering

Copyright 2001, Dialogic Corporation
All rights reserved
This page generated October, 2001