5.1. Troubleshooting Checklist
An installation oversight often creates a problem in an assembled system or testing setup. When isolating a problem, check the physical equipment first. If problems continue, confirm that:
- All boards are firmly seated and secured in their PC expansion slots.
- Daughterboard modules are firmly seated on the baseboard.
- For Linux, confirm that the Sun Java 2 Runtime Environment, Standard Edition, version 1.3 is installed.
- The IRQ setting of the board you suspect has a problem does not conflict with other expansion boards in your system.
- Each ISA/BLT or hardware configurable board has a unique board locator number or shared RAM address.
- The configuration data is correct.
- The Dialogic System Release Software and SDK is properly installed.
- The UDD software is properly installed.
A known good board can be used to verify that the UDD software has been installed properly.
Click here to contact Dialogic Customer Engineering
Copyright 2001, Dialogic Corporation