Powering off the GAD secondary storage system
Use the following procedure to power off the GAD secondary storage system in a GAD 3DC delta resync environment.
Procedure
Using the alternate path software, stop I/O from servers to the GAD secondary storage system.
Direct server I/O to the primary storage system.On the primary storage system, resynchronize the GAD pair by specifying the P-VOL.
Command example:pairsplit -g oraHA -IH0Confirm that the pair statuses are changed as shown in the following table.
Pair type
Before the GAD pair suspension
After the GAD pair suspension
P-VOL
S-VOL
P-VOL
S-VOL
GAD pair
PAIR (Mirror(RL))
PAIR (Mirror(RL))
PSUS (Local)
PSUS (Block)
UR pair
PAIR
PAIR
PAIR
PAIR
UR delta resync pair
PSUS1
SSUS1
PSUE2
SSUS1
Notes:
- Device Manager - Storage Navigator displays HOLD.
- Device Manager - Storage Navigator displays HOLDING.
Power off the GAD secondary storage system.
