Powering off external storage system, I/O at secondary site (GAD+UR)
Use the following procedure to power off the external storage system when server I/O continues to the GAD storage system in a GAD 3DC delta resync environment.
Procedure
Using the alternate path software, stop I/O from servers to the primary storage system. Direct server I/O to the GAD secondary storage system.
On the GAD secondary storage system, suspend the GAD pairs by specifying the S-VOL (swap suspension).
Command example:pairsplit -g oraHA -RS -IH1Confirm that the pair types and the pair statuses are changed as shown in the following table.
Before the GAD pair suspension
After the GAD pair suspension
Pair type
Pair status
Pair type
Pair status
P-VOL
S-VOL
P-VOL
S-VOL
GAD pair
PAIR (Mirror(RL))
PAIR (Mirror(RL))
GAD pair
PSUS (Block)
SSWS (Local)
UR pair
PAIR
PAIR
UR delta resync pair
PSUE1
SSUS2
UR delta resync pair
PSUS2
SSUS2
UR pair
PAIR
PAIR
Notes:
- Device Manager - Storage Navigator displays HOLDING.
- Device Manager - Storage Navigator displays HOLD.
On the primary and GAD secondary storage systems, disconnect the quorum disks.
Command example:raidcom disconnect external_grp -ldev_id 0x8888 -IH1NoteWhen you disconnect a quorum disk, SIM (def0zz) (quorum disk blockade) might be issued (zz: quorum disk ID). If this SIM is issued, delete the SIM after powering on the storage system and reconnecting the quorum disk.Power off the external storage system.
