Setting the Fibre Channel topology
Use this procedure to set the topology (FC-AL or P-to-P) of a Fibre Channel port.
CautionWhen a port has a path defined for an LDEV with the
GAD reserve attribute and you need to change the topology, the operation might fail if you configure more than one port at a time. For ports that have a path defined for an LDEV with the
GAD reserve attribute, perform this operation on one port at a time.
Procedure
Click Storage Systems, and then expand the Storage Systems tree.
Click Ports/Host Groups/iSCSI Targets.
In the Ports/Host Groups/iSCSI Targets window, click the Ports tab.
Select the desired port, and then click Edit Ports.
Under Connection Type, select FC-AL or P-to-P.
Click Finish.
The Confirm window opens.In the Task Name text box, type a unique name for the task or accept the default.
You can enter up to 32 ASCII characters and symbols, with the exception of: \ / : , ; * ? " < > |. The value <date>-<window name> is entered by default.Click Apply.
If the Go to tasks window for status check box is selected, the Tasks window appears.
