After services are switched from the production center to the DR center through planned migration, the services must be switched back to the production center based on a drill plan.
Before the services are switched back, you need to perform a DR test to verify the data availability to ensure that services can be switched back successfully. After the test, you must clear the test data to avoid switchback failure caused by test data. For details, see DR Testing in the DR Center.
This step aims to switch services back to the production center from the DR center.
After you complete the planned migration, the application systems are working in the original production center and protected groups become Invalid. To ensure that the production center can be recovered from the DR center in case an event (planned or unplanned) happens on it after the switchback, perform reprotection and recover the replication relationship between the production center and the DR center to synchronize data and ensure that services are protected. For details, see 5 to 6 in Planned Migration of Services in the Production Center.
Once the reprotection is complete, the protected groups become normal.