This section describes how to execute planned migration at DR sites if data or applications at the production site need to be recovered from DR sites due to power failure, upgrade, or maintenance. During planned migration, the latest service data changes will be synchronized to DR sites. Ensure that the management and storage networks between sites are normal.
If you do not perform at least one successful DR test, the failure probability of the planned migration will increase, and executing planned migration failed will stop production service. Therefore, before performing planned migration, you are recommended to perform at least one successful DR test.
If the recovery plan is based on the snapshot or clone protection policy template, planned migration cannot be performed.
The time of planned migration is related to the migrated data, the greater the amount of data, the longer the planned migration time.
In disaster recovery data center solution (geo-redundant mode) scenario, the service can be migrated from production center to same-city DR center or remote DR center.
Recovery.The Planned Migration dialog box is displayed.
The available powered-on host can provide resources for VMs.
In the Available VMs list, select non-critical VMs you want to stop to release computing resources.
If the non-essential VM fails to be stopped, manually stop the VM on the FusionCompute management portal.
After the planned migration starts, you can view the execution process and result. If the task is failed, you can solve the problem and execute the task again.
After executing planned migration, the service is running in the DR sites. If the service is switched to original production sites, execute the following steps:
Before switching service, executing reprotection can protects running data at the DR site and copy the service data as the specified protection policy in the DR sites during running to the original production sites.
After executing reprotection, the service data, you need to test a recovery plan to verify the availability and ensure the service is switched successfully before data replicated to original production sites.
Delete the test data generated on the DR system and restore the DR environment to facilitate future switched DR.
Executing planned migration, the service was migrated from DR sites to original production sites and the service is running in the production sites.
Ensure the in-plan and out-plan event occurs when service was switched to the original production sites and can be recovered in the DR sites, executing reprotection can protect the system service.
After the planned migration is successfully executed, you can export the configuration file, and view information about the FusionCompute VMs before and after the planned migration, such as resource mappings. To export the configuration file, perform the following steps:
Export to save the exported configuration file locally.