Services are migrated from the production center to the DR center due to a recoverable fault such as an unexpected power failure. After the production center recovers from the fault, you must synchronize data generated during the DR from the DR center to the production center and switch services back to the production center.
Before the services are switched back, you need to perform a DR test to verify the data availability to ensure that services can be successfully switched back. After the test, you must clear the test data to avoid switchback failure caused by test data. For details, see DR Testing in the DR Center.
This step aims to switch services back to the production center from the DR center. After the migration, check the data. For details, see 2 to 3 in Planned Migration of Services in the Production Center.
Copy data from the production center to the DR center to recover the protected group status.