If the production center encounters anticipated risks (such as power outage and routine O&M), you can perform planned migration on a specified recovery plan. The entire process is automatic without manual intervention. The DR site automatically takes over services. After the planned migration is complete, you can perform reprotection on the recovery plan to reversely protect services taken over by the DR center.
If no DR test is performed before the planned migration, the migration has a higher rate to fail. A migration failure will interrupt DR services. For this reason, at least one recovery plan test must be executed successfully before the planned migration.
You are advised to configure application-based protection policies to support planned migration by one click.
You can check data consistency by viewing the last entry of data written to the production and DR centers. If the last entry of data is the same, the data consistency is ensured.
Vastbase cluster: Ensure that the underlying storage link is normal.
After the planned migration is complete, the application system is working in the DR center and protected groups become Invalid. You must perform reprotection to recover the replication status and synchronize the data from the DR center to the production center. Then, the original DR center becomes the new production center.
To ensure that the protection and recovery configurations before reprotection do not affect the running of the protected group and recovery plan after reprotection, the system automatically clears the protection and recovery configurations after reprotection. After reprotection, you need to reconfigure the protection and recovery policies to ensure normal running of DR services.
After the reprotection is complete, the protected group becomes normal.