Performing Planned Migration from the Production Center to the Remote DR Center

This section describes how to perform planned service migration from the production center to the remote DR center on cascading and parallel networks.

Prerequisites

Context

The following DR scenarios do not support reprotection:
  • In the Geo-Redundant Solution based on cascading replication (synchronous and asynchronous) or parallel replication (synchronous and asynchronous), reprotection cannot be implemented after services are switched over to the remote DR center.
  • In the Geo-Redundant Solution based on cascading replication (asynchronous and asynchronous), reprotection cannot be implemented after services are switched over to the remote DR center.

    After services in the production center are migrated to the remote DR center in a planned manner, protected groups become invalid. You need to manually configure the protected groups after services are migrated back to the production centers.

Procedure

  1. Perform the planned migration on eReplication in the remote DR center.

    Migrate services in the production center to the remote DR center. After the migration, test data and clear the data generated during tests. For details, see 1 to 4 in Planned Migration from the Production Center to the Same-City DR Center.

Result

After the planned migration is performed:


Copyright © Huawei Technologies Co., Ltd.