Planned Failback from the Remote DR Center to the Production Center (Parallel Network)

In an asynchronous and asynchronous network, eReplication can be used to switch services from the remote DR center back to the production center. On a parallel network in synchronous+asynchronous mode, you need to manually switch services back from the remote DR center to the production center.

Prerequisites

Context

Procedure

Result


Copyright © Huawei Technologies Co., Ltd.