This section describes how to test data in the DR center. DR tests are implemented by snapshot mapping in the DR center. The test is to verify that data or snapshots replicated to the DR center are available. The test process has no adverse impact on the production site. After a test is complete, the test data generated at the DR site needs to be cleared and resources need to be restored to the status before the test to facilitate future DR or planned migration.
Due to the importance of DR tests, notify the following:
Before clicking Test, you can click the Procedure tab, click Edit, select the operation to be edited from the drop-down list in the displayed window, and enable or disable the configurable step as required.
If Huawei UltraPath has been installed on the Linux-based DR host, ensure that I/O suspension time is not 0 and all virtual devices generated by UltraPath have corresponding physical devices. For details, see the OceanStor UltraPath for Linux xxx User Guide.
If the test fails, clear the data by referring to 4 and perform the test again.
Verify that applications are started and accessed successfully. If an application fails to be started or cannot execute read and write operations, contact Huawei technical support.
You can use self-developed scripts to scan for disks, start applications, and test applications.