Services are migrated from the production center to the DR center due to a recoverable fault such as an unexpected power failure. After the production center recovers from the fault, you must synchronize data generated during the fault period from the DR center to the production center and switch services back to the production center.
The fault recovery has been successfully executed based on the recovery plan on the original DR center.
Ensure that the applications in the production center have been stopped and prepare for disk uninstallation.
Copy data from the DR center to the production center to complete the initial data synchronization.
Before the services are switched back, you need to perform a DR test to verify the data availability to ensure success rate of service failback. After the test is complete, clear the test data generated from the DR test to prevent the test data from adversely affecting the service failback rate. For details, see DR Test in the DR Center.
This step aims to switch services back to the production center from the DR center. After migration, data must be checked and test data must be cleared. For details, see 1 to 3 in Planned Migration of Services in the Production Center.
Copy data from the production center to the DR center to recover the protected group status.