If you plan to configure logical partitions, install the server into a rack, use the Integrated Virtualization Manager, set up the Hardware Management Console (HMC), or install the HMC into a rack, then use this checklist to help you set up your system.
If you need help setting up the (HMC), contact your next level of support or your hardware service provider.
To learn more about the virtualization
features offered by IBM® eServer™ OpenPower™ servers,
see the e-learning course available from the IBM Hypervisor and Virtual I/O Server Web site at http://www.ibm.com/eserver/openpower/virtualization
.
For a successful installation, complete the following tasks in order.
| Before you begin | |||
|---|---|---|---|
| __ | Good planning is essential for the successful setup and use of your server. The customized Planning Checklist provides you with the planning tasks you need to perform. Have you completed the Planning Checklist?
|
||
| __ | If you are planning to install a previous firmware version on your system and the fifth digit of your model's serial number is non-hexadecimal, ensure that your firmware is at least version 2.3.5 before beginning the installation. |
||
| __ | Ensure that you have completed the tasks from the Quick start guide for OpenPower 710 |
||
If you have not completed these tasks, links to this information are also available below. |
|||
| Initial server setup checklist | Printable PDFs | |||
|---|---|---|---|---|
| 1. | Install the server into a rack. Note: Due to tipping considerations and for your safety
and that of the equipment, IBM does
not ship the 7014 series model T42 or 0553 system racks populated above the
36U mark. Some additional installation of rack-mounted units might be required.
|
Installing
the rack, rack features, and system or expansion unit into a rack |
||
| 2. | Select the method you will use to create logical partitions. | |||
| • | HMC | |||
| __ |
Attention: Do not connect the server to a power
source.
|
|||
| __ | ||||
| __ | ||||
| __ | ||||
| • | Integrated Virtualization Manager | |||
| __ |
Attention: Do not connect the server to a power
source.
|
|||
| __ | ||||
| __ | Enter the activation code for Virtualization Engine™ technologies. |
|||
| __ | Install the Virtual I/O Server and enable the Integrated Virtualization Manager. |
|||
| __ | Connect to the Integrated Virtualization Manager Web-based interface or Connect to the Virtual I/O Server command-line interface. |
|||
| __ | ||||
| 3. | ||||
| 4. | ||||
| 5. | Get fixes. | |||
| __ | ||||
| __ | ||||
| __ | ||||
| After you finish | |||
|---|---|---|---|
| __ | (Optional) Complete additional setup tasks. |
||