PWR1920

Use this procedure to verify that the lights on the server control panel and the display panel on all attached I/O expansion units are operating correctly.

Please see Power isolation procedures for important safety information before continuing with this procedure.

Refer toLocating FRUs for instructions for removing and replacing any FRUs called out by the following procedure.

  1. Activate the Lamp Test by performing ONE of the following:
  2. Review the server control panel and the display panels on all attached I/O towers. The lamp test is only active on the I/O towers for 25 seconds after you press Enter. Check the following lights on at the control panel and all attached enclosures: Are all lights on at the control panel and all attached I/O enclosures?
  3. Are any abnormal characters or character patterns (not reference codes or normal display mode) displayed?
  4. Verify that all cables are seated correctly. If the problem persists, replace the following field replaceable units in the failing enclosure one at a time:

    This ends the procedure.