Connecting the SAN Volume Controller 2145-4F2 to the 2145 UPS-1U

Connect the SAN Volume Controller to the 2145 UPS-1U to protect your data in the event of an unexpected loss of external power.

Attention: The SAN Volume Controller 2145-4F2 node is supported only in SAN Volume Controller 4.3.1 and earlier releases.
Note: To make the SAN Volume Controller cluster more resilient to power failure, the 2145 UPS-1U units can be connected to the redundant ac-power switch. If a redundant ac-power switch is not used, you can connect the two uninterruptible power supply units that are powering an I/O group to different, independent electrical power sources. If a single power source fails, the SAN Volume Controller cluster can then continue to operate with reduced performance.

Before you begin this task, see the completed user's cable connection table, which is described in the IBM® System Storage® SAN Volume Controller Planning Guide and was downloaded from www.ibm.com/storage/support/2145.

Use the information in this table to identify the 2145 UPS-1U unit to which this node is to be connected.

Perform the following steps to connect the SAN Volume Controller 2145-4F2 to the 2145 UPS-1U:

  1. At the back of the SAN Volume Controller 2145-4F2, plug the combined power and serial cable into the power connector (number two in Figure 1).
    Figure 1. Connecting the SAN Volume Controller 2145-4F2 power cable to the 2145 UPS-1U
    Connecting the SAN Volume Controller 2145-4F2 power cable to the 2145 UPS-1U
    • number one Fibre-channel ports
    • number two Power connector
    • number three Serial connector
    • number four Ethernet ports
    • number five Main power connector
    • number six Communication port
    • number seven Load segment 2 receptacle
  2. Place the other end of the power cable into the rightmost load segment 2 receptacle number seven on the 2145 UPS-1U.
    DANGER
    You have already switched on the 2145 UPS-1U. The output sockets of the 2145 UPS-1U are live.
  3. Plug the signal cable into the serial connector number three that is located on the SAN Volume Controller 2145-4F2.
  4. Place the other end of the signal cable into the communication port number six on the 2145 UPS-1U.

The SAN Volume Controller 2145-4F2 power is now connected to the 2145 UPS-1U.