Installing the SAN Volume Controller 2145-CF8

There are several steps that you must perform to install the SAN Volume Controller 2145-CF8 node.

Installing the SAN Volume Controller 2145-CF8 consists of the following tasks:
  1. Installing the support rails in the rack cabinet.
  2. Installing the SAN Volume Controller 2145-CF8 node.
  3. Installing the cable-management arm in the rack cabinet.
  4. Connecting the SAN Volume Controller 2145-CF8 node to the uninterruptible power supply.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2003, 2009. All Rights Reserved.