Before the IBM® service
representative can
set up your SAN Volume Controller environment,
you must verify that the prerequisite conditions for the SAN Volume Controller,
the uninterruptible
power supply,
and optional redundant ac-power switch installation
are met.
This information considers the
hardware components that are currently supported.
- Does your physical site meet the environment requirements
for the SAN Volume Controller, uninterruptible
power supply,
and the redundant ac-power switch?
- Do you have adequate rack space for your hardware? Ensure
you have the following rack space for your components:
- The SAN Volume Controller:
One Electronic Industries Alliance (EIA) unit high for each node.
- The 2145 UPS-1U:
One EIA unit high for each 2145 UPS-1U.
- If you are using a redundant ac-power switch:
One EIA unit high for each redundant ac-power switch
- Do the power circuits you will be using have sufficient
capacity and the correct sockets for your SAN Volume Controller installation?
A clearly visible and accessible emergency power off switch
is required.
If you are using the redundant ac-power switch,
two independent power circuits are required. One circuit connects
to the redundant ac-power switch main
input and the other circuit connects to the redundant ac-power switch backup
input.
- Have you provided appropriate connectivity by preparing
your environment?
- Do you have a keyboard and display available in the unusual
event that a service action requires them? The SAN Volume Controller 2145-CF8 , SAN Volume Controller 2145-8A4 and SAN Volume Controller 2145-8G4 nodes
require a Universal Serial Bus (USB) keyboard.
- Do you have adequate space available and power for the IBM System Storage® Productivity
Center?