Installing the SAN Volume Controller 2145-8G4

There are several steps that you must perform to install the SAN Volume Controller 2145-8G4 node.

Installing the SAN Volume Controller 2145-8G4 consists of the following tasks:
  1. Installing the support rails in the rack cabinet.
  2. Installing the SAN Volume Controller 2145-8G4 node in the rack cabinet.
  3. Connecting the SAN Volume Controller 2145-8G4 to the uninterruptible power supply.
  4. Installing the cable retention bracket on the SAN Volume Controller 2145-8G4.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2003, 2009. All Rights Reserved.