Installing the support rails for the uninterruptible power supply

You must install the support rails in the rack before installing the uninterruptible power supply 2145-1U (2145 UPS-1U) or the uninterruptible power supply 2145 (2145 UPS).

Complete the following prerequisites before installing the support rails:

Perform the following steps to install each support rail:

  1. Attach nut clips number four to the rack. These nut clips must align with the second and fourth holes of the support rail flange.
  2. Loosen wing nuts number two and number three.
  3. Slide the bracket toward the back of the rail.
  4. Remain at the back of the rack, hold the support rail in position in the rack, and then install and fully tighten the two mounting screws number five.
  5. Go to the front of the rack.
  6. Extend the support rail toward the front of the rack.
    Note: Hold the support rail in position until you have completed step 8.
  7. Ensure that the support rail is horizontal. You may want to use a level to ensure the support rail is straight.
  8. Install the two mounting screws number one into the third and fourth holes of the support rail flange. Fully tighten the screws.
  9. Fully tighten the two wing nuts shown as number two in the figure.
  10. With wing nut number three still loosened, slide the bracket toward the front of the rail, as far as it will go, with the front edge of the bracket against the back end of the front support rail. Fully tighten the wing nut number three.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2003, 2009. All Rights Reserved.