You must install the support rails that hold the SAN Volume Controller 2145-8A4 node.
Figure 1 shows
the items that you need to install the
SAN Volume Controller 2145-8A4 node
in a rack.
Figure 1. SAN Volume Controller 2145-8A4 support-rails
installation kit
- 1 Rear of rail
- 2 Shipping bracket
- 3 M6 screws (6)
- 4 Rack mounting rails
- 5 Front of rail
Notes: - With some types of racks, you might find it helpful to remove
the rack doors and side panels to provide easier access during installation.
- The slide rails are marked (RIGHT / FRONT and LEFT / FRONT) for
proper placement on the rack flanges.
- The front and back of each rail has a spring-loaded rail-locking
carrier, which can be locked in the open position and then released
when the rail is in the rack.
When you are ready to install
the support rails, use the customer's hardware-location chart and
the Electronic Industries Alliance (EIA) positions on the rack to
determine where in the rack that the SAN Volume Controller node
is to be installed.
Perform the following steps to install the support rails:
- Ensure that the rail-locking carriers
at the front and rear of each support rail are open.
The mechanism to open is similar at each end. If a locking mechanism
is closed, as shown in Figure 2 (for
a front bracket), open it.
Figure 2. A closed rail-locking
carrier at the front of the support rail for the SAN Volume Controller 2145-8A4
To open the rail-locking carrier,
push the small tab 3 back away from
the rail and slide the larger tab 2 toward
the center of the slide rail. Slide the rail-locking carrier approximately
15 mm toward the end of the slide rail until the rail-locking carrier
locks in the open position, as shown in Figure 3 (which shows the
rear bracket).
Figure 3. An
open rail-locking carrier at the rear of the support rail for the SAN Volume Controller 2145-8A4
- Position the rail at the correct height in the rack.
- Start from the front and align the pins ( 1 in Figure 4) on the front rail-locking
carrier with the holes on the rack mounting flange 2 .
- Release the rail-locking latch by pushing the smaller
blue tab 3 away from the rail. The
pins spring into the closed position. Ensure that the pins go fully
through the holes in the mounting flange, as shown in Figure 4.
- At the rear of the rack, align the pins on the rear
rail-locking carrier with the holes on the rack mounting flange.
Figure 4. Aligning the pins
on the left front support rail for the SAN Volume Controller 2145-8A4 with
the front mounting flange
- Insert one of the M6 screws into the front
and rear locking latches and tighten.
- Repeat the instructions in steps 1 through 3 with the right support
rail.