Before you or your IBM® service
representative installs
the SAN Volume Controller nodes, uninterruptible
power supply units,
and IBM System Storage® Productivity
Center,
you must plan the physical configuration and the initial settings
for the system.
- Download the hardware location chart, the cable connection
table, the configuration data table, and the optional redundant ac
power switch connection chart from the following Web site:
www.ibm.com/storage/support/2145
- Click the Plan/upgrade tab.
- Under Sizing/Capacity, click SAN Volume Controller planning.
- Click your language to view the Planning Guide abstract. The charts
and tables are under the Related information heading.
- Use the hardware location chart to record the physical
configuration of your system.
- Use the cable connection table to record how you want your SAN Volume Controller units,
the uninterruptible
power supply units,
and the IBM System Storage Productivity
Center to
be connected.
- Use the configuration data table to record the data that
you and the IBM service
representative need
before the initial installation.
When you or your IBM service
representative have completed these tasks, you can perform the physical installation.