Follow these instructions when you are prompted to replace
the SAN Volume Controller 2145-CF8.
Attention: Do
not touch the power control switches on adjacent SAN Volume Controller nodes
when you remove or install SAN Volume Controller nodes
in a rack. Touching these switches on adjacent SAN Volume Controller nodes
might cause those devices to turn off and make customer data inaccessible.
Use the reference
numbers in parentheses at the end of each notice, such as (C003) for
example, to find the matching translated notice in IBM® Systems Safety Notices.
Perform the following steps to replace the SAN Volume Controller 2145-CF8 in
a rack:
- Place the SAN Volume Controller 2145-CF8 in
the rails on the rack.
- Pull the slide rails forward ( 1 in Figure 1) until they
click twice into place.
- Carefully lift the server and tilt it into position
over the slide rails so that the rear nail heads 2 on
the server line up with the rear slots 3 on
the slide rails.
- Slide the server down until the rear nail heads slip
into the two rear slots; then slowly lower the front of the server 4 until
the other nail heads slip into the other slots on the slide rails.
- Verify that the front latch 5 slides
over the nail heads.
Figure 1. Installing
the SAN Volume Controller 2145-CF8 node
in the slide rails of the rack
- Lift the locking levers ( 1 in Figure 2) on the slide
rails and push the server 2 all the way
into the rack until it clicks into place.
Figure 2. Raising the SAN Volume Controller 2145-CF8 locking
levers of the slide rails of the rack
- Replace the cable-management
arm. See Replacing the cable-management arm.
- Reconnect the fibre-channel
and Ethernet cables. Ensure that you replace the fibre-channel
and Ethernet cables in the same ports from which they were removed.
- Connect the power cable to the node and replace the
cable-retention bracket. See Replacing the cable-retention bracket.
- Replace the cable-management arm, as described
in Replacing the cable-management arm.
- Turn on the node.