Replacing the SAN Volume Controller 2145-8F4 or SAN Volume Controller 2145-8F2 power
supply
Ensure that you are aware of the procedures for handling static-sensitive
devices before you remove the power supply.
To replace the SAN Volume Controller 2145-8F4 or SAN Volume Controller 2145-8F2 power
supply, perform the following steps:
Install the power supply in the empty power supply bay:
Rotate the handle down on the
rear of the power supply to the open position, and then slide the
power supply forward into the power-supply bay, as shown in Figure 1.
Figure 1. SAN Volume Controller 2145-8F2 power
supply
Handle
Power supply
Dc power LED
Ac power LED
Gently lift the handle up until it clicks. This signals
that the power supply is securely seated in the bay.
Connect the power cord for the new power supply to the
power-cord connector on the power supply.
Reconnect the power cord and turn on the 2145 UPS-1U.
Turn on the node.
Make sure that the power-supply fan starts and the ac power
LED and dc power LED (shown in Figure 2) on the power
supply are lit, indicating that the power supply is operating correctly.
Figure 2. SAN Volume Controller 2145-8F2 or SAN Volume Controller 2145-8F4 ac
and dc power LEDs