Replacing the SAN Volume Controller 2145-8F2 or SAN Volume Controller 2145-8F4 operator-information panel

You might have to replace the operator-information panel on a SAN Volume Controller 2145-8F2 or SAN Volume Controller 2145-8F4 due to required maintenance.

Perform the following steps to replace the operator-information panel:
  1. Plug in the two cables on the rear of the assembly Reference key one. See Figure 1.
    Figure 1. Replacing the operator-information panelReplacing the operator-information panel
    • Reference key one Cables
    • Reference key two Operator-information panel assembly cover
  2. Replace the assembly cover Reference key two onto the operator-information panel assembly.
  3. Slide the assembly into the node until it is firmly anchored.
  4. Replace the top cover and replace the node in the rack, if necessary.
  5. Connect all power cords and external cables to the back of the server.
  6. Turn on the node.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2003, 2009. All Rights Reserved.