Removing the power cable from the 2145 UPS-1U

You can remove the power cable from the 2145 UPS-1U if you are having problems with the power supply and suspect that the power cable is defective.

Perform the following steps to remove the power cable:

  1. Remove the power from each SAN Volume Controller node. See MAP 5350: Powering off a SAN Volume Controller node for information about removing the power cable from the SAN Volume Controller.
  2. Press and hold the on/off button Reference key two until the power light Reference key one is extinguished (approximately five seconds). On some versions of the 2145 UPS-1U, you need a pointed device, such as a screwdriver, to press the on/off button. The 2145 UPS-1U enters standby mode, with all indicators off. Figure 1 illustrates the front and rear views of the 2145 UPS-1U.
    Figure 1. Front and back panels for the 2145 UPS-1U
    Front and back panels for the 2145 UPS-1U
    • Reference key one Power-on indicator
    • Reference key two On/off button
    • Reference key three Power cable
  3. Disconnect the power cable from the main power source number three.
  4. Replace the power cable and make sure it is seated. The 2145 UPS-1U enters standby mode. All indicators are off and power is not available to the SAN Volume Controller. The battery recharges when necessary.
  5. To turn the 2145 UPS-1U on, press and hold the on/off button number two until the 2145 UPS-1U power button Reference key one is illuminated (approximately five seconds). On some versions of the 2145 UPS-1U, you need a pointed device, such as a screwdriver, to press the on/off button. The front panel indicators then cycle through a startup sequence while the 2145 UPS-1U conducts a self-test. When the self-test completes, the power-on indicator and the load indicators illuminate to show that the 2145 UPS-1U is supplying power. The 2145 UPS-1U resumes service in normal mode.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2003, 2009. All Rights Reserved.