MAP 5250: 2145 UPS-1U repair
verification helps you to verify that field replaceable units (FRUs)
that
you have exchanged for new FRUs, or repair actions that were done,
have solved
all the problems on the SAN Volume Controller 2145 UPS-1U.
If you are not familiar with these maintenance analysis
procedures (MAPs), first read Using the maintenance analysis procedures.
You
may have been sent here because you have performed a repair and want
to confirm
that no other problems exist on the machine.
Perform
the following steps:
- Are
the power-on and load segment 2 indicators
for the repaired 2145 UPS-1U illuminated
solid green, with service, on-battery, and overload indicators off?
- (from step 1)
Is
the SAN Volume Controller node
powered by this 2145 UPS-1U powered
on?- NO
- Press power-on on
the SAN Volume Controller node
that is connected to this 2145 UPS-1U and
is powered off. Go to step 3.
- YES
- Go to step 3.
- (from step 2)
Is
the node that is connected to this 2145 UPS-1U still
not powered on or showing error codes in the front panel display?- NO
- Go to step 4.
- YES
- Continue with MAP 5000: Start.
- (from step 3)
Does
the SAN Volume Controller node
that is connected to this 2145 UPS-1U show "Charging" on
the front panel display?- NO
- Go to step 5.
- YES
- Wait for the "Charging" display
to finish (this might
take up to two hours). Go to step 5.
- (from step 4)
Press
and hold the test/alarm reset button on the repaired 2145 UPS-1U for
three seconds to initiate a self-test. During the test, individual
indicators
illuminate as various parts of the 2145 UPS-1U are
checked.