Removing the power cable from the 2145 UPS

You can replace the power cable from the 2145 UPS if you are having problems with the power supply and suspect that the power cable is defective.

Perform the following steps to remove the power cable:

  1. Remove the power from each SAN Volume Controller node. See MAP 5350: Powering off a SAN Volume Controller node for information about removing the power cable from the SAN Volume Controller.
  2. Press and hold the off switch number two. A long beep sounds for approximately five seconds. When the beep stops, release the switch. The mode indicator number one, shown in Figure 1, flashes and the 2145 UPS enters standby mode.
    Figure 1. Front and back view of the 2145 UPS
    This figure shows the front and back view of the 2145 UPS
    • number one Mode indicator
    • number two Off switch
    • number three Power cable
  3. Unplug the power cable number three from the main power source.
  4. Reinstall the power cable (or replace it) to return power to the 2145 UPS. The 2145 UPS runs a self-test and enters standby mode.
  5. Press and hold the on switch until, after approximately one second, the 2145 UPS beeps. The mode indicator stops flashing and the load-level indicators show the percentage of load that the 2145 UPS supplies.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2003, 2009. All Rights Reserved.