Complete this task to import and define a simulated configuration
of physical and logical characteristics in a storage complex by connecting
to a storage complex on the management console.
- In the navigation, select .
- In the Select Action drop-down list, select Import..., and then click Go. The
Import Storage Complex — Define management consoles page is displayed.
- In the Define management consoles page,
establish the Management console IP addresses that are required to make a
direct connection to a storage complex. If you check the box for Define
a second Management console, you must enter an IP address in the Management
console 2 IP address field.
- Click Next to continue. The Import data
page is displayed.
- In the Import data page, you must select
at least one of the four options.
- If you select the General storage complex settings box,
only the general settings for the storage complex are imported.
- If you select the All storage unit physical configurations box,
only the physical characteristics of each storage unit are imported.
- If you select the All storage unit logical configurations box,
the physical and logical configuration characteristics of each storage unit
are imported. If you had not previously selected the All storage
unit physical configurations box, it becomes checked.
- If you select the All host attachments for Storage
Units box, , the physical and logical configuration characteristics
of the storage unit plus all of the host attachment characteristics are imported
to the application. If you had not checked the previous two boxes, they become
checked.
- Click Next to continue. The General page is displayed.
- In the General page,
you must specify a nickname. Specifying a description is optional.
- Click Next to continue. The Verification
page is displayed.
- Use the Verification page to review the established attributes
and verify that they are correct.
- If the attributes and values are not correct, click Back as
appropriate to return and specify the correct values. Otherwise, click Finish to
complete the import storage complex process.