Installing the front display panel

Complete this task to install or replace the front display panel or the right front bezel. If you are installing the front panel display after removing it for a servicing procedure, you can install it whether the system is powered off or powered on.

ESD warningUse approved ESD procedures to prevent damage.

Important: When you replace the front display panel in an enclosure, ensure that all resources from a particular server or expansion enclosure are reinstalled into the same physical enclosure and in the same location inside that enclosure.

The front display panel and right front bezel are located on the left and right of the front of the enclosure, respectively.

Location of front display panel

To install the front panel display, perform the following steps:

  1. Use the handle to align the top of the display panel with the empty slot. The top of the front display panel must fit over the metal support at the top of the slot at the same time that the back of the handle fits under the metal catch on the side of the slot.
  2. Push the handle down and into the recessed slot so that it is flush with the front of the enclosure. This will lock the front display panel into position.
This image shows a front display panel replacement procedure.
Front display panel remove and replace procedure
Related concepts
Front display panel
MTMS labels
Related tasks
Attaching the ESD wrist strap
Assigning a storage unit to a storage complex (real-time only)
Requesting a replacement part
Related reference
DS6000 resource location codes
Understanding ESD requirements
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2004, 2007. All Rights Reserved.