Preinstallation planning and verification

Use this information to prepare the DS6000™ for installation into a rack.

Prior to installation, ensure that you complete the following steps to prepare the DS6000 for installation into a rack.
  1. Prepare the site to meet all safety and environmental requirements.
  2. Prepare the site to meet all space and floor load requirements.
  3. Prepare the site to meet all power requirements.
  4. Prepare the site to meet all network and communications requirements.
Library | Support | Terms of use | Feedback
© Copyright IBM Corporation 2004, 2007. All Rights Reserved.