PRJ4: Gridlines Overwritten When Non-working Time in Front
  
PSS ID Number: Q113339
Article last modified on 07-21-1995
 
4.00    | 4.00
 
WINDOWS | MACINTOSH
 

----------------------------------------------------------------------
The information in this article applies to:
 
 - Microsoft Project for Windows version 4.0
----------------------------------------------------------------------
 
SUMMARY
=======
 
When Non-Working Time is drawn "In Front of Task Bars", any Major or
Minor column gridlines during those times will be overwritten.
 
MORE INFORMATION
================
 
When Microsoft Project draws objects that are going to appear on the
Gantt chart, it does so in layers. The items displayed in the
"background" are drawn on the lowest layer, and those in the
"foreground" are drawn on the highest layer. If two elements are to
be drawn in the same spot on the Gantt Chart, the one in the
foreground will be the one that is displayed.
 
When Non-Working time is set to be drawn in front of the task bars,
it is moved into the top layer. The gridlines drawn in the timescale
are drawn in a lower layer.  Thus Non-working time will always be
drawn above the gridlines, making them disappear.
 
KBCategory: kbusage
KBSubcategory:
 
Additional reference words: 4.00
=============================================================================
Copyright Microsoft Corporation 1995.