SAPC Upgrade Information
Ericsson Service-Aware Policy Controller

Contents

1SAPC Upgrade Information Introduction
1.1SAPC Upgrade Information Prerequisites
1.1.1Hardware Requirements
1.1.2Software Requirements
1.2Related Information

2

Upgrade Overview
2.1Lead Times of Upgrade to SAPC 1.3
2.2Downtime
2.3Traffic Loss
2.4Service Disturbances

1   SAPC Upgrade Information Introduction

This document contains information needed for upgrading to SAPC 1.3 .

This document is to be used when planning upgrades on customer sites and covers the following topics:

This document is intended for personnel handling the planning of the upgrade of the SAPC.

1.1   SAPC Upgrade Information Prerequisites

This section describes the prerequisites which must be fulfilled before the SAPC can be upgraded to.

1.1.1   Hardware Requirements

Following SAPC deployment layouts are supported for upgrade information:

1.1.2   Software Requirements

The required SAPC SW components and versions are as follows:

1.2   Related Information

The complete information of the upgrade process can be found in the following documents:

2   Upgrade Overview

This section describes the upgrade procedure from an impact point of view.

2.1   Lead Times of Upgrade to SAPC 1.3

From previous SAPC releases to SAPC 1.2

For information on the lead time for upgrading the SAPC broken down into steps, see Table 1.

Table 1    Detailed Lead Times from Previous SAPC Releases to SAPC 1.2

SAPC

Estimated Time (Minutes)

Estimated Time during Maintenance


Window (Hours)(1)

Comment

Pre Phase

Upgrade

Post Phase

Backup

Pre


Steps

Health Check

Health Check

Post


Steps

Backup

Off Maintenance Window

During Maintenance Window

BSP 8100


2+10PLs

5

10

5

30

5

 

5

2

 

NSP 6.1


2+10PLs

5

10

5

55

5

 

5

2

 

VNF


2+2PLs(2)

5

10

5

30

5

 

5

2

 

VNF


2+10PLs(3)

5

10

5

30

5

 

5

2

 

(1)  Including a hypothetical RollBack procedure.

(2)  PLs with 2 vCPU/10 GB.

(3)  PLs with 8 vCPU/12 GB.


From SAPC 1.2onward

For information on the lead time for upgrading the SAPC broken down into steps, see Table 2.

Table 2    Detailed Lead Times from SAPC 1.2onward

SAPC

Estimated Time (Minutes)

Estimated Time during Maintenance


Window (Hours)(1)

Comment

Pre Phase

Upgrade(2)

Post Phase

Backup

Pre


Steps

Health Check

Health Check

Post


Steps

Backup

Off Maintenance Window

During Maintenance Window

BSP 8100


2+10PLs

5

10

5

85

5

 

5

3

 

NSP 6.1


2+10PLs

5

10

5

140

5

 

5

4

 

VNF


2+2PLs(3)

5

10

5

45

5

 

5

2

 

VNF


2+10PLs(4)

5

10

5

160

5

 

5

4

 

(1)  Including a hypothetical RollBack procedure.

(2)  The upgrade time is directly proportional to amount of Pay Loads.

(3)  PLs with 2 vCPU/10 GB.

(4)  PLs with 8 vCPU/12 GB.


2.2   Downtime

From previous SAPC releases to SAPC 1.2

During the upgrade the following down times are expected:

  • Time without Service Accessibility:

    Downtime is expected during the upgrade.

    Access to VIPO is lost during the cluster reboot performed during the upgrade.

    This downtime corresponds to the following output during the upgrade execution:

    Error getting state of "SAPC-CXP9030138_7-7.2.0-16"
    5 secs to retry [get_current_state 
    SAPC-CXP9030138_7-7.2.0-16] (100 attempts still remain)

  • Time without Session Retainability:

    Downtime is expected during the upgrade. Active sessions are lost during upgrade to SAPC 1.3.

    Note:  
    It is not recommended to execute Operational & Maintenance traffic during the upgrade process.

From SAPC 1.2onward

During the upgrade the following down times are expected:

  • Time without Service Accessibility:

    No Downtime is expected during the upgrade

    Established connections with VIPO are disconnected for a moment.

  • Time without Session Retainability:

    Active sessions are not lost during upgrade to SAPC 1.3.

    Note:  
    It is not recommended to execute Operational & Maintenance traffic during the upgrade process.

2.3   Traffic Loss

From previous SAPC releases to SAPC 1.2

During the upgrade the following traffic loss is expected:

Table 3    Detailed Traffic Loss Times from Previous SAPC Releases to SAPC 1.2

SAPC

Estimated traffic loss time (Minutes)

Comment

 
 
 

BSP 8100


2+10PLs

13

 

NSP 6.1


2+10PLs

20

 

VNF


2+2PLs(1)

12

 

VNF


2+10PLs(2)

12

 

(1)  PLs with 2 vCPU/10 GB

(2)  PLs with 8 vCPU/12 GB


From SAPC 1.2 onward

Less than 2% traffic loss.

2.4   Service Disturbances

During the upgrade the following impact on services is expected: