1 Introduction
This document provides instructions for installing and performing a basic configuration of hardware in Ericsson Dynamic Activation (EDA) using GEP3 blades.
The hardware components included in this configuration contain 4–12 GEP3 blades. The hardware is complemented with a pair of SCX switches and a pair of CMX routers.
1.1 Purpose and Scope
The scope of this document is to:
- Specify all hardware components required for installing the system.
- Provide instructions on how to install and mount all hardware components in a cabinet.
- Specify the required cabling.
- Prepare and conduct a maiden installation of all hardware and software products as well as an initial installation and basic configuration of all hardware-related software.
1.2 Target Group
The target group for this document is as follows:
- System Administrator
- Network Administrator
- System Integrator
- Technicians who install the hardware.
The target groups are described in more detail in the Library Overview, Reference [1], document.
1.3 Typographic Conventions
Typographic conventions are described in the document Library Overview, Reference [1].
For information about abbreviations used throughout this document refer to Glossary of Terms and Acronyms, Reference [2].
2 Prerequisites and Preparations
Installation of the Dynamic Activation GEP3 system requires that the user has:
- Linux system administration skills
- Switch and router administration skills
- The document Customer Questionnaire for Native Deployment, Reference [5] is available with all values of the installation parameters.
2.1 Hardware and Software Required
This section specifies hardware and software prerequisites and describes what to prepare before an installation.
2.1.1 Hardware
It is a prerequisite to have the correct hardware set ordered according to BSP 8100 recommendations. Deviations from the quantity or type of hardware can result in immediate or future problems.
This document is used for performing a maiden installation of GEP3, CMXB3, and SCXB3.
If using GEP5, CMXB3, and SCXB3, refer to Hardware Installation and IP Infrastructure Setup for Native Deployment GEP5, Reference [19].
2.1.2 Software
Verify that the correct software is delivered. Deliveries can be retrieved from the software gateway web page https://swgateway.ericsson.net/. Check the release note of the specific product for information about how to download it.
For information about the software delivered with Dynamic Activation, refer to Software Specification, Reference [3].
2.1.2.1 LDEwS Installation Media
For information on how to configure an installation server on LDEwS, see LDEwS SW Installation, Reference [11].
2.2 Documentation
The software component products that together form the system are delivered in a hardware-independent way. The documentation for the respective products does not assume any specific hardware set onto which they are installed.
The included hardware and software components provide a full set of documentation targeted to different users. The documentation is provided in two different types of ALEX libraries, the Customer Product Information (CPI Store) library and the Support (CAL Store) library. The CPI library is targeted for external customers (end users) and the Support library is written for Ericsson internal personnel. For example, BUGS and R&D personnel.
The documentation for the following components can be found and downloaded from CPI Store (http://cpistore.internal.ericsson.com/alex) or CAL Store (http://cpi2.al.sw.ericsson.se/alex).
The following set of libraries are of relevance for this Dynamic Activation GEP3 system:
| LDEwS (Linux Distribution Extensions with SUSE) | Provides both a CPI library and support library | |
| eVIP LSB | Provides both a CPI library and support library | |
| BSP |
Provides a support library http://calstore.internal.ericsson.com/alexserv?li=EN/LZN7800024* | |
Ensure that the following documents have been read:
- Personal Health and Safety Information, see Reference [6].
- System Safety Information, see Reference [7].
2.3 Tools
The following tools are required:
- Installation server used for LDEwS and BSP installation.
- Tools required for installation of an EGEM2 subrack with a pair of SCXs in BYB 501 cabinet is presented in BSP Hardware Installation, Reference [8]. This document is available in the BSP document library.
- Screwdriver of type TORX bits (size T5 and T8) is needed for installation of GEP3, CMX, and SCX blades.
- To install the required SW, an installation server is used. The BSP documentation refers to it as a jumpstart server. A Console Server can be used for the basic initial configuration of BSP. The required tools are described in BSP Jumpstart Instruction, Reference [10].
- The basic initial configuration of GEP3, CMX, and SCX blades are made through a Command-Line Interface (CLI) using a terminal. For example, a Console Server, a terminal, or a PC with a serial port.
- A Console Server is recommended for remote access to GEP3 and SCX blades. CMX is administered from the SCXs. An alternative to a Console Server could be a terminal or a PC with a serial port and a terminal cable.
2.4 Conditions
Before using this Installation Instruction, verify that a site inspection has been performed, see Section 3.1.1.
The instructions throughout this document are based on the assumption that a Console Server is used.
3 Installation
This section goes through all installation steps. Upon completion of this section, the system is installed.
The reader will be guided by installing product after product while pointing at the product installation instruction. If deviations from a separate product installation are required, these are stated in this document. The information given in this document thus overrides similar information in the product own installation instruction.
The installation results in:
- Hardware configured and installed.
- IP network configured.
- LDEwS operating system installed.
- eVIP installed.
- Dynamic Activation application installed.
This installation instruction provides the complete installation flow for the Dynamic Activation GEP3 system as shown in Figure 8.
3.1 Hardware Installation
This section provides the complete hardware installation flow for the Dynamic Activation GEP3 system. The BSP Hardware Installation, see BSP Hardware Installation, Reference [8], is used as a base in this instruction.
Figure 2 shows the workflow that must be performed to install the hardware.
3.1.1 Site Inspection
Perform site Inspection as described in BSP Hardware Installation, Reference [8].
3.1.2 Site Preparation
Prepare the site as described in BSP Hardware Installation, Reference [8].
3.1.3 Visual Inspection of Mechanical Parts
Perform a visual inspection of the cabinet and subrack equipment as described in BSP Hardware Installation, Reference [8].
The Dynamic Activation GEP3 system includes several separate delivery packages that need to be assembled to build a complete system.
For detailed information regarding the different hardware parts, see BSP Hardware Description, Reference [22].
3.1.4 Installing the Cabinet
This section provides instructions how to install cabinets with all hardware components required for the Dynamic Activation GEP3 system.
When working with plug-in units such as GEP3 blades and CMX blades, use an Electrostatic Discharge (ESD) wrist strap to avoid ESD damage. Connect the strap to the ESD connection point in the upper part of the cabinet. When handling the unit, do not touch any components or connector pins.
An example of a Dynamic Activation GEP3 system cabinet where the EGEM2 subrack is placed in the bottom of the cabinet is shown in Figure 3.
3.1.4.1 Installing the Base Cabinet
Install the BYB 501 cabinet in accordance with the general installation procedures in Installation of Equipped Cabinet BYB 501, Reference [12].
3.1.4.2 Installing the EGEM2 Subrack with SCXs
Install the EGEM2 subrack with SCXs in the cabinet as described in BSP Hardware Installation, Reference [8].
In addition, also install the power cables to the PFM units as described in BSP Hardware Installation, Reference [8].
Check the address plugs as described in BSP Hardware Installation, Reference [8].
A subrack must have an address. In Dynamic Activation GEP3, the address is set to 0. This can be arranged to adjust dip switches on the address plugs. In total, each subrack has three address plugs.
- Note:
- The second (from bottom in the subrack) address plug slot is empty.
For more information see BSP System Architecture Description, Reference [13].
3.1.4.3 Installing the GEP3, SCX, and CMX Blades
The GEP3 blades are inserted in the EGEM2 subrack in slot positions 1, 3, 5, 7, ..., 23.
The SCX blades are inserted in the EGEM2 subrack in slot positions 0 and 25.
The CMX blades are inserted in the EGEM2 subrack in slot positions 26 and 28.
Slot positions in the EGEM2 subrack are described in Figure 4.
Install the GEP3 blades, SCX, and the CMX blades in the EGEM2 subrack by repeating the following steps for each blade:
- Remove the unit from its ESD bag.
- Check that there is no obvious damage.
- Check the product identity of the unit.
- Align the blade with the upper card rails in the subrack.
- Carefully push the blade plug-in unit into the subrack. Tighten the mounting screws, with a torque of 0.5–0.7 Nm.
When all blades have been installed in the EGEM2 subrack, the procedure is completed and the ESD wrist strap can be removed.
3.1.5 Power and Grounding
Connect the cabinet to ground and install the power cables (HOD or LOD) connected to the PFM units to the power supply as described in BSP Hardware Installation, Reference [8].
3.1.6 Cabling and Wiring
This section contains information about cabling and wiring of the Dynamic Activation GEP3 system.
Use an ESD wrist strap to avoid ESD damage. Connect the strap to the ESD connection point in the upper part of the cabinet. When handling the unit, do not touch any components or connector pins.
3.1.6.1 Internal Data Cabling
General
The internal cables are to be connected to the ports as shown in Figure 5.
The types of cables to use are listed in the Internal Cables for BSP Hardware document, section Cable Types, Reference [20].
The Table 1, Table 2, Table 3, and Table 4 show the system internal data cables connections.
|
SCX-0-0 |
Destination |
Label |
|
E3 |
CMX-0-26; Port: E5 |
|
SCX-0-25 |
Destination |
Label |
|
E3 |
CMX-0-28; Port: E5 |
|
CMX-0-26 Port |
Destination |
Label |
|
E3 |
CMX-0-28; Port: E3 |
CMX-0-26_E3 |
|
E4 |
CMX-0-28; Port: E4 |
|
CMX-0-28 Port |
Destination |
Label |
|
E3 |
CMX-0-26; Port: E3 |
CMX-0-28_E3 |
|
E4 |
CMX-0-26; Port: E4 |
CMX-0-28_E4 |
3.1.6.2 External Data Cabling for 1GE External Uplink Configuration
This section applies when using two physical cables for each CMX.
Connect the two external cables to each CMX. Each cable uses 1Gb interface and is connected to the GE4 or GE2 port, as shown in Figure 6.
The types of cables to use are listed in the External Cables for BSP Hardware document, section Cable Types, Reference [21].
The Table 5 and Table 6 show the system external data cables connections.
Uplink Traffic 0 and Uplink Traffic 1 must not be connected to the same customer equipment. This to avoid single point of failure.
Uplink OAM 0 and Uplink OAM 1 must not be connected to the same customer equipment. This is to avoid single point of failure.
|
CMX-0-26 Port |
Destination |
Label |
|
GE4 |
Uplink OAM 0 (customer equipment) |
Site-specific labeling |
|
GE2 |
Uplink Traffic 0 (customer equipment) |
|
CMX-0-28 Port |
Destination |
Label |
|
GE4 |
Uplink OAM 1 (customer equipment) |
Site-specific labeling |
|
GE2 |
Uplink Traffic 1 (customer equipment) |
Site-specific labeling |
3.1.6.3 External Data Cabling for 10GE External Uplink Configuration
This section applies when using one physical cable for each CMX and the mandatory Active Patch Panel (APP) HW.
The APP is an Optical/Electrical (O/E) converter used for optical Ethernet connection. APP HW is mandatory for 10GE external uplink configuration.
APP HW is not required for 1GE external uplink configuration.
The cables are connected as shown in Figure 7.
The types of cables to use are listed in the Internal Cables for BSP Hardware document, section Cable Types, Reference [20].
For more information about the APP, refer to the BSP Hardware Description document, sections Active Patch Panel and Sample Installation, Reference [22], and the BSP Hardware Installation document, Reference [8].
For information on how to define an APP after BSP is configured, refer to the BSP Initial Configuration document, Reference [9].
- Note:
- When using 10GE External Uplink Configuration, both Traffic and OAM goes through one single uplink port, E7.
The Table 7 to Table 11 show the data cables connections.
|
CMXB Port |
Destination |
Label |
|
E7 |
Upper APP port 10GbE B |
Site specific labeling |
|
CMXB Port |
Destination |
Label |
|
E7 |
Lower APP port 10GbE B |
Site specific labeling |
|
SCXB Port |
Destination |
Label |
|
Upper APP port DeniA |
Site specific labeling |
|
SCXB Port |
Destination |
Label |
|
Lower APP port DeniB |
|
APP Port |
Destination |
Label |
|
Upper APP port DeniB |
Lower APP port DeniA |
Site specific labeling |
3.1.7 Power-on and Check
Power On and check the EGEM2 subrack as described in BSP Hardware Installation, Reference [8].
3.1.8 Final Assembly
Power On and check the EGEM2 subrack as described in BSP Hardware Installation, Reference [8].
3.1.9 Console Access Settings
This section contains information on the basic Console Access settings regarding the SCXB3 switches and the GEP3 blades.
A Console Server can be connected locally for out-of-band configuration and management. The Console Server provides a way to connect to the management interfaces on the RS232 port.
3.1.9.1 Configuring Basic Settings for SCX
Use these serial port settings for SCX:
- Baud rate: 115200
- Data bits: 8
- Parity: None
- Hardware Flow Control: Yes
- Software Flow Control: None
Use the following credentials to log on to the SCX:
|
Login: |
root |
|
Password: |
tre,14 |
3.1.9.2 Configuring Basic Settings for GEP3
Use these serial port settings for the GEP3 blades:
- Baud rate: 115200
- Data bits: 8
- Stop bit: 1
- Parity: None
- Flow Control: None
- DTR behavior: High when open
Use the following credentials to log on to the GEP3 blades:
|
Login: |
root |
|
Password: |
<User_Defined_Password>(1) |
(1) This password is defined during the installation.
3.2 Installation Tools Preparation
For the hardware configuration part, prepare the following:
- If using a Console Server, connect it to the "RS232"
port on the SCXs. For all GEP3 blades, if using a Console Server,
connect it to the "CONS" port.
If Putty is used as terminal, set the keyboard to Xterm R6 to get F<x> buttons to work.
- Connect the installation server to the "DBG" port on
the left SCX (SCX-0-0) for the BSP SW installation. The connection
from the installation server is to be moved to the eth0 front port
on the GEP3 blade, acting as the first System Controller (SC) blade
SC-1 for the LDEwS installation.
More information is found in BSP Jumpstart Instruction, Reference [10].
For more information regarding the hardware configuration, see Section 3.3.
3.3 Installation and Configuration
- Note:
- Make sure that the instructions in Section 3.1 are fulfilled before proceeding.
This section presents all installation and basic configuration steps of the BSP, GEP3, CMX, and CMX parts of the system.
The following work process shows all steps that must be performed to install and perform a basic configuration of BSP. The workflow is shown in Figure 8.
The basic configuration is conducted after stepping through this section.
3.3.1 Installing BSP Software
- Install BSP software as described in BSP Jumpstart Instruction, Reference [10].
- Note:
- The default SCX root user password is tre,14.
The default SCX advanced user password is ett,30.
The default CMX root user password is tre,14.
The default CMX advanced user password is ett,30.
3.3.2 Prepare the EDA Native BSP8100 Config Generator Tool
This section includes information on how to prepare the tool to be able to retrieve the generated artifacts.
- Download the EDA Native BSP8100 Config Generator tool:
- Save the zip file, EDA_Native BSP8100_Config_Generator.zip to, for example a local area on a local machine
- Unpack the zip file.
3.3.3 Accessing Hardware Specific Information
This section describes how to obtain the MAC addresses of the GEP3 blades, that are to be used in the EDA Native BSP8100 Config Generator tool.
3.3.3.1 Getting MAC Addresses and Preparing Jumpstart
The MAC addresses are input to the EDA Native BSP8100 Config Generator tool to generate the cluster.conf file which is used by LDEwS. They are also used for the dhcpd.conf file, which is used by the Installation server for LDEwS installation, see LDEwS SW Installation, Reference [11]. The procedure is as follows:
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Execute the following command to get
the MAC addresses on all blades in the cluster:
# count=1; while (test "$count" -le 24); do result=`blade_ipmi getBladeMacAddresses $count`; if [[ ${result} =~ "ERROR" ]]; then break; else echo $result | grep -io '[0-9A-F]\{2\}\(:[0-9A-F]\{2\}\)\{5\}' | head -1; fi; let "count=count+2"; done
Example printout:
90:55:AE:3B:0A:DD
90:55:AE:3B:07:95
90:55:AE:3B:05:FD
90:55:AE:3B:09:8D
- Start the EDA Native BSP8100 Config Generator tool. Double-click the Activation_ConfigGen.jar file located in the folder where the tool was unzipped.
- Note:
- Requires Oracle's JAVA version 1.8.0_71 or higher.
- Copy the retrieved printout in Step 4. In the EDA Native BSP8100 Config Generator tool, go to tab Import > MAC Addresses. And paste the copied MAC addresses in the newly displayed window,
all at once as one string.
Table 12 is an example of how the tool calculates and maps the MAC addresses for eth3, eth4, eth5, and eth6 on the GEP3 blade for the cluster.conf file.
eth0 is used for the dhcpd.conf file.
|
GEP3 | ||
|---|---|---|
|
First MAC address |
90:55:AE:3B:0A:DD | |
|
eth0 - MAC Address for ext.PXE Boot in the EDA Native BSP8100 Config Generator tool. |
increase with 5 |
90:55:ae:3b:0a:e2 |
|
eth3 |
increase with 1 |
90:55:ae:3b:0a:de |
|
eth4 |
increase with 2 |
c8:35:b8:27:3c:df |
|
eth5 |
increase with 8 |
c8:35:b8:27:3c:e5 |
|
eth6 |
increase with 9 |
c8:35:b8:27:3c:e6 |
- Set the MAC address in dhcpd.conf.
GEP3:
Use the generated, by the EDA Native BSP8100 Config Generator tool, MAC Address for ext.PXE Boot address.
- Note:
- All fields in the following example are mandatory. Addresses
and netmask must be changed to reflect the setup of the network.
The next-server parameter in the example below refers to the installation server.
# # /etc/dhcpd.conf # ddns-update-style none; subnet 192.168.0.0 netmask 255.255.255.0 { filename "pxelinux.0"; next-server 192.168.0.10; host control1 { hardware ethernet 90:55:ae:3b:0a:e2; fixed-address 192.168.0.1; } } # End of file - Restart the dhcpd server to load the new values:
# /etc/init.d/dhcpd restart
- Create an etc directory in /tftpboot:
# mkdir /tftpboot/etc
- Mount the LDEwS iso file to the /mnt:
# mount -o loop ldews-4.0.5-iso-sle-ana90139.iso /mnt
- Copy the content of the iso file to /tftpboot:
# cp -r /mnt/* /tftpboot
3.3.4 Preparing Deployment Artifacts
- If not already started, start the EDA Native
BSP8100 Config Generator tool by double-clicking the Activation_ConfigGen.jar file, located in the folder
where the tool was unzipped.
- Note:
- Requires Oracle's JAVA version 1.8.0_71 or higher.
- Fill in the required values.
- Note:
- It is important to know the hardware type (in this case GEP3), what Uplink Redundancy to use (BFD/VRRP) it affects the parameter choices for the PROV_OM_CN and OM_CN_SP tabs, and the number of nodes that are to be used.
Example of a filled in form using GEP3 as hardware type, VRRP as Uplink Redundancy, and four nodes:
- Note:
- All fields are not required in the General Parameters area. It is optional to choose between, one, two or none DNS IP addresses, and one or two NTP IP addresses.
- Note:
- It is possible to save the filled in values as a .cnf file by clicking File > Save as.
- When all values are filled in, click the Generate
Artifacts button to generate the following configuration
files:
BSP_Common cluster.conf CMX-0-26-BSP-VRRP CMX-0-28-BSP-VRRP GEP3-installation.conf evip.xml
Click on All in the prompted Selection window.

Save the generated files on the local machine.
3.3.5 BSP Configuration
In this section BSP Common, CMX-0-26 and CMX-0-28 are configured by using the files generated by EDA Native BSP8100 Config Generator tool.
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Enter cliss:
# cliss
BSP 8100
This system is provided for authorized users only.
If you are not an authorized user, please
exit IMMEDIATELY. - Change scriptmode to on.
> scriptmode on
- Note:
- When executing cliss on a MontaVista based SCXB, scriptmode must be set to on. This is to avoid problems with pasting configuration to cliss over RS-232.
- Paste the commands from the generated BSP_Common file:
> <All commands from BSP_Common file>
- Note:
- It is advisable to paste in smaller parts of the file, including a commit -s command, and not all commands at the same time.
- Paste all the commands from the generated CMX-0-26-BSP file in the terminal window.
> <All commands from CMX-0-26-BSP file>
- Note:
- It is advisable to paste in smaller parts of the file, including a commit -s command, and not all commands at the same time.
- Paste all the commands from the generated CMX-0-28-BSP file in the terminal window.
> <All commands from CMX-0-28-BSP file>
- Note:
- It is advisable to paste in smaller parts of the file, including a commit -s command, and not all commands at the same time.
- Lock all empty slots (not containing any GEP blades) in
the cluster. Run the following
command for all empty slots in the cluster, one at a time:
(config-NextHop=vipprov)> ManagedElement=1,Equipment=1,Shelf=0,Slot=<slot position_of_empty_slot>,Blade=1,administrativeState=LOCKED
- Note:
- For a cluster that consists of four GEP blades, the <slot position_of_empty_slot> variable will be 9,
11, 13, 15, 17, 19, 21, and 23.
For a cluster that consists of six GEP blades, the <slot position_of_empty_slot> variable will be 13, 15, 17, 19, 21, and 23.
For a cluster that consists of 12 GEP blades, no action is needed.
When all empty slot positions are locked, run the following command:
(config-NextHop=vipprov)> commit -s
- Exit configuration mode:
(config-NextHop=vipprov)> end
(NextHop=vipprov)> top
- Create a backup of the CMX configuration.
Example:
> ManagedElement=1,SystemFunctions=1,BrM=1,BrmBackupManager=1,createBackup MyFirstBackup
- Note:
- If the backup creation command is valid, output 0 is received
Output:
0
- Verify that the backup process was completed successfully:
> show ManagedElement=1,SystemFunctions=1,BrM=1,BrmBackupManager=1,progressReport
- Note:
- The backup process takes a couple of minutes before it is
successful.
If the backup was not successful, contact Ericsson support personnel for further help.
Example - Viewing createBackup Action Information:
progressReport actionId=0 actionName="createBackup" progressInfo="" progressPercentage=100 result=SUCCESS resultInfo="BSP configuration successfully saved" state=FINISHED timeActionCompleted="2014-07-28T14:17:31Z" timeActionStarted="2014-07-28T14:17:29Z" timeOfLastStatusUpdate="2014-07-28T14:17:31Z"
- Check the backup status:
> show ManagedElement=1,SystemFunctions=1,BrM=1,BrmBackupManager=1,BrmBackup=1,status
Example - Viewing Backup Status:
status=BRM_BACKUP_COMPLETE
- Exit cliss:
> exit
3.3.6 GEP3 BIOS Settings
Prepare the GEP3 BIOS settings to match the LDEwS settings for, boot order and for disabling the Power Technology. For detailed information about the GEP3 BIOS see BIOS Menus and GPRs, Reference [16].
3.3.6.1 Change Boot Device Order of GEP3 Blades
Change the boot device order for the SCs and Payload (PLs). The SCs are to boot from only Internal SAS Disk (device=10) and PLs from Backplane left device and then Backplane right device.
This is performed by using the following command in the UEFI shell environment:
ipmi bo <command> <direction> <priority> <device>
Change Boot Device Order for SCs
- Set terminal baud rate settings on Console Server, hyper terminal, minicom, and more, to the baud rate used by GEP3 BIOS.
- Prepare for a serial connection towards the still powered
off SC blade:
# telnet <Console Server IP-address> <port number connected to SC blade>
- Note:
- If Putty is used as terminal, set the keyboard to Xterm R6.
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Enter cliss:
# cliss
BSP 8100 R15A
This system is provided for authorized users only.
If you are not an authorized user, please
exit IMMEDIATELY. - Turn off and on the power
for the GEP3 blade acting as SC-1.
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=1,Blade=1,administrativeState=LOCKED
(config)> commit -s
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=1,Blade=1,administrativeState=UNLOCKED
(config)> commit -s
- During the BIOS startup sequence, wait for the console
printout Press F3 for GEP PopUp and then press:
F3

- Choose the option 40 - UEFI Shell (PBIST) by entering the value:
> 40
In the next screen shown, press any key within a few seconds to proceed to the UEFI shell.

- Clear the present boot device order with command:
> ipmi -o erase
- Check the result by command:
> ipmi -o display
Must be empty.
- Set boot device order to Internal SAS disk by command:
> ipmi -o insert 1 10
(1=priority, 10=Internal SAS disk).

- Reset the blade:
> pbist -r
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Enter cliss:
# cliss
BSP 8100 R15A
This system is provided for authorized users only.
If you are not an authorized user, please
exit IMMEDIATELY. - Turn off the power for
the GEP3 blade acting as SC-1.
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=1,Blade=1,administrativeState=LOCKED
(config)> commit -s
- Repeat Step 1 to Step 18 for SC-2. To turn off and on power
in Step 7, use:
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=3,Blade=1,administrativeState=LOCKED
(config)> commit -s
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=3,Blade=1,administrativeState=UNLOCKED
(config)> commit -s
Change Boot Device Order for PLs
- Set terminal baud rate settings onf Console Server, hyper terminal, minicom, and more to the baud rate used by GEP3 BIOS.
- Prepare for a serial connection towards the still powered
off PL blade:
# telnet <Console Server IP-address> <port number connected to PL blade>
- Note:
- If Putty is used as terminal, set the keyboard to Xterm R6.
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Enter cliss:
# cliss
BSP 8100 R15A
This system is provided for authorized users only.
If you are not an authorized user, please
exit IMMEDIATELY. - Turn off and on the power
for the GEP3 blade acting as PL-3..
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=5,Blade=1,administrativeState=LOCKED
(config)> commit -s
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=5,Blade=1,administrativeState=UNLOCKED
(config)> commit -s
- During the BIOS startup sequence, wait for the console
printout Press F3 for GEP PopUp and then press:
F3
See also screen capture in previous chapter.
- Choose the option 40 - UEFI Shell (PBIST) by entering the value:
> 40
In the next screen shown, press any key within a few seconds to proceed to the UEFI shell. See also screen capture in previous chapter.
- Clear the present boot device order with command:
> ipmi -o erase
- Check the result by command:
> ipmi -o display
Must be empty.
- Set boot device order to Backplane left device by command:
> ipmi -o insert 1 00
(1=priority, 00=Backplane left device).
- Set boot device order to Backplane right
device by command:
> ipmi -o insert 2 01
(2=priority 2, 01=Backplane right device).

- Reset the blade:
> pbist -r
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Enter cliss:
# cliss
BSP 8100 R15A
This system is provided for authorized users only.
If you are not an authorized user, please
exit IMMEDIATELY. - Turn off the power for the
GEP3 blade acting as PL-3.
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=5,Blade=1,administrativeState=LOCKED
(config)> commit -s
- Repeat Step 1 to Step 19 for all PL blades. To turn power off
and on in Step 7, make sure that
the corresponding PL data is given as input for the command:
Enter configuration mode:
- Note:
- The <slot position> variable corresponds to the slot position of the GEP3 blade.
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=<slot position>,Blade=1,administrativeState=LOCKED
(config)> commit -s
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=<slot position>,Blade=1,administrativeState=UNLOCKED
(config)> commit -s
- Exit:
(config)> end
> exit
3.3.6.2 Disable Power Technology
This chapter describes how to disable the Power Technology in the GEP3 BIOS.
- Note:
- Repeat all the following steps for all GEP3 blades.
- Set the terminal baud rate settings on Console Server, hyper terminal, minicom, and more, to the baud rate used by the GEP BIOS.
- Prepare for a serial connection towards the GEP3 blade
that is to be disabled:
# telnet <Console Server IP-address> <port number connected to the blade>
- Note:
- If Putty is used as terminal, set the keyboard to Xterm R6.
- Log in to SCX where the DMXC is active:
# telnet <Console Server IP-address> <port number connected to SCX-0-0 or SCX-0-25>
Wind River Linux release 3.0.2
Kernel 2.6.27.39 on ppc (ttyS0)
SC-2-2 login: root - Enter root as logon.
Password:
- Enter tre,14 as password.
Last login: Tue Aug 11 12:45:43 on ttyS0
Wind River Linux glibc_std (standard) 3.0.2
Last failed login by root was on
2015-08-11T10:28:01.617+0000 from localhost (ttyS0) - Enter cliss:
# cliss
BSP 8100 R15A
This system is provided for authorized users only.
If you are not an authorized user, please
exit IMMEDIATELY. - Turn on the power for the GEP3 blade:
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=<slot position>,Blade=1,administrativeState=UNLOCKED
The <slot position> variable corresponds to the slot position of the GEP3 blade.
(config)> commit -s
- During the BIOS startup sequence, wait for the following
console printout:
Press <DEL> or <F4> to enter set up.
Press F4
A new window is displayed, see Figure 13.
- Use the arrow keys to navigate to the Advanced menu, see Figure 14.
- In the Advanced window, use the arrow
keys to navigate to the CPU Configuration menu and
press:
Enter
A new window is displayed, see Figure 15.
- In the CPU Configuration window, use
the arrow keys to navigate to the Power Technology menu and press:
Enter
A new window is displayed, see Figure 16.
- In the Power Technology window, use the
arrow keys to choose Disable and press:
Enter
- To Save and Exit press:
F4
Use the arrow keys to choose Yes and press:
Enter
- From the terminal window:
Turn off the power for the first GEP3 blade:
Enter configuration mode:
> configure
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=<slot position>,Blade=1,administrativeState=LOCKED
The <slot position> variable corresponds to the slot position of the GEP3 blade.
(config)> commit -s
- Repeat Step 1 to Step 14 for all GEP3 blades in the subrack.
- Exit:
(config)> end
> exit
3.4 LDEwS Installation
This section describes how to install LDEwS on a Dynamic Activation cluster running on GEP3.
3.4.1 GEP3 LDEwS Installation
- Rename the GEP3-installation.conf (generated by the EDA Native BSP8100 Config Generator tool), to installation.conf.
- Copy the renamed installation.conf file, and by the EDA Native BSP8100 Config Generator tool generated cluster.conf file, to the /tftpboot/etc directory on the jumpstart server.
- Log on to the CLI:
# ssh -p 2024 advanced@<BSP-NBI-IP>
- Connect the LDEwS installation server to the ETH0 front port on the GEP3 blade acting as the first control node (SC-1).
- Open a terminal window and
connect to SC-1:
- Note:
- If Putty is used as terminal, set the keyboard to Xterm R6.
# telnet <Console Server IP-address> <port number connected to SC-1>
- Turn on the power for the GEP3 blade acting as SC-1:
Enter configuration mode:
> config
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=1,Blade=1,administrativeState=UNLOCKED
(config-Blade=1)> commit -s
- In the terminal window connected to SC-1, see Step 5, during the BIOS startup sequence
wait for the console printout Press F3 for GEP PopUp and then press F3. Select 02 as the
device to boot from, which is front interface ETH0 on blade 1, SC-1.
- Note:
- There is no need to enter the BIOS to configure the node to boot from hard disk because that has already been configured in Section 3.3.6.
- When SC-1 is rebooted, log in as root user with password rootroot and change root password:
# ssh root@<PG_OM_SP1_SC_1_IP>
# passwd
- Open a terminal window and
connect to SC-2:
- Note:
- If Putty is used as terminal, set the keyboard to Xterm R6.
# telnet <Console Server IP-address> <port number connected to SC-2>
- Turn on the power for the GEP3 blade acting as SC-2:
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=3,Blade=1,administrativeState=UNLOCKED
(config-Blade=1)> commit -s
- In the terminal window connected to SC-2, see Step 9, during the BIOS startup sequence
wait for the console printout Press F3 for GEP PopUp and then press F3. Select 00 as device
to boot from, which is the blade 2, SC-2, backplane interface. This
means that SC-2 is to do a PXE boot from SC-1.
- Note:
- There is no need to enter the BIOS to configure the node to boot from hard disk because that must be already have been configured in Section 3.3.6.
- The software installation starts and the following text
is shown:
Installing, please wait...
The software installation is completed once the following text is shown:
Installation completed successfully
If anything went wrong during the installation, the following message is shown instead:
Installation failed (see /root/install.log)
- Run the following command to see the synchronization progress:
# drbd-overview
- Note:
- The time duration to complete the disk synchronization is about 30 minutes.
- Open a terminal window and connect to each PL node:
# telnet <Console Server IP-address> <port number connected to each PL node>
- Power on each PL node:
(config)> ManagedElement=1,Equipment=1,Shelf=0,Slot=<slot position>,Blade=1,administrativeState=UNLOCKED
The <slot position> variable corresponds to the slot position of the GEP3 blade.
(config)> commit -s
- Wait for each PL node to boot up in operational mode.
When the boot sequence is completed, a log in prompt is shown.
The PL nodes are now installed.
3.4.1.1 Partitioning on PL Nodes
This section describes the disk preparations in Dynamic Activation 16.2 when using GEP3 blades.
- On the current
PL node, check if any labels exist, and if that is the case remove
them. Use the following command to check for labels:
# blkid
If nothing is returned, no labels exist.
Use the following commands to remove existing labels:
Example printout using sdb:
# dd if=/dev/zero of=/dev/sdb1 bs=1k count=5k
# dd if=/dev/zero of=/dev/sdb2 bs=1k count=5k
# dd if=/dev/zero of=/dev/sdb3 bs=1k count=5k
# dd if=/dev/zero of=/dev/sdb4 bs=1k count=5k
Check that no partition exists on the 300GB disk by using the following command:
# blkid
sdb is used as a device example in the following steps.
- Change disk label:
# parted /dev/sdb mklabel gpt
- Create the first partition:
# parted /dev/sdb mkpart primary ext3 1049KB 10GB
- Create the second partition:
# parted /dev/sdb mkpart primary ext3 10GB 20GB
- Create the third partition:
# parted /dev/sdb mkpart primary ext3 20GB 199GB
- Print the partition:
# parted /dev/sdb print
A printout when three partitions have been created on the current PL:
Model: TOSHIBA MBF2300RC (scsi) Disk /dev/sdb: 300GB Sector size (logical/physical): 512B/512B Partition Table: gpt Number Start End Size File system Name Flags 1 1049kB 10.0GB 10GB primary 2 10.0GB 20.0GB 10GB primary 3 20.0GB 199GB 179GB primary
- Create the file systems on the new partitions on the current
PL node. Below are three partitions labeled:
# mkfs.ext3 -L DVE_LOGS /dev/sdb1
# mkfs.ext3 -L CAS_COMLOG /dev/sdb2
# mkfs.ext3 -L CAS_DATA /dev/sdb3
- Verify the labels
on the partitions:
# blkid
/dev/sdb1: LABEL="DVE_LOGS" UUID="4ad44e29-06e9-4a66- 9963-e3f6c04b00d8" TYPE="ext3" SEC_TYPE="ext2" /dev/sdb2: LABEL="CAS_COMLOG" UUID="8f6b2eb4-4525-48ea- 8736-7b14a2c1dd66" TYPE="ext3" SEC_TYPE="ext2" /dev/sdb3: LABEL="CAS_DATA" UUID="386c9dad-198f-4142- bd5f-d550012c86f1" TYPE="ext3" SEC_TYPE="ext2"
- Repeat step Step 1 to Step 8 on each PL node.
3.5 SNMP Configuration
SNMPv2c
For information on how to configure SCX and CMX for SNMPv2c, refer to Create SNMPv2C Target, Reference [14].
SNMPv3
For information on how to configure SCX and CMX for SNMPv3, refer to Create SNMPv3 Target, Reference [15].
3.6 Dynamic Activation Software Installation
Perform the installation of the Dynamic Activation software according to the Software Installation for Native Deployment, Reference [18] document.
Reference List
| [1] Library Overview, 18/155 17-CSH 109 628 Uen |
| [2] Glossary of Terms and Acronyms, 0033-CSH 109 628 Uen |
| [3] Software Specification, 1/190 20-CSH 109 628 Uen |
| [4] Parameter List for Native Deployment, 5/1057-CSH 109 628 Uen |
| [5] Customer Questionnaire for Native Deployment, 4/1057-CSH 109 628 Uen |
| [6] Personal Health and Safety Information, 124 46-2885 Uen |
| [7] System Safety Information, 124 46-2886 Uen |
| [8] BSP Hardware Installation, 1/1531-CRA 119 1772 Uen |
| [9] BSP Initial Configuration, 3/1531-APP 111 01 Uen |
| [10] BSP Jumpstart Instruction, 2/1531-APP 111 01 Uen |
| [11] LDEwS SW Installation, 1/1531-ANA 901 39/3 Uen |
| [12] Installation of Equipped Cabinet BYB 501, 1531-FCM 101 1317 Uen |
| [13] BSP System Architecture Description, 3/1551-APP 111 01 Uen |
| [14] Create SNMPv2C Target, 39/1543-APA 901 44/1 Uen |
| [15] Create SNMPv3 Target, 33/1543-APA 901 44/1 Uen |
| [16] BIOS Menus and GPRs, 2/15519-CXC1060242 Uen |
| [17] Network Description and Configuration for Native Deployment, 2/1551-CSH 109 628 Uen |
| [18] Software Installation for Native Deployment, 1/1531-CSH 109 628 Uen |
| [19] Hardware Installation and IP Infrastructure Setup for Native Deployment GEP5, 3/1531-CSH 109 628 Uen |
| Other Documents |
|---|
| [20] Internal Cables for BSP Hardware. 1070-CRA 119 1772 Uen |
| [21] External Cables for BSP Hardware. 1/1070-CRA 119 1772 Uen |
| [22] BSP Hardware Description. 1/1551-APP 111 01 Uen |

Contents