Stop Threshold Monitoring Job

Contents


1   Description

This instruction describes how to stop a threshold monitoring job. In maintenance situations, the user can suspend a threshold monitoring job to avoid forwarding threshold alarms to the management system when the Managed Element (ME) is unstable and already given specific attention. This is also a way to reduce the load on the ME.

2   Procedure

2.1   Stop Threshold Monitoring Job

Prerequisites

Steps

  1. Navigate to the PmJob managed object, for example:

    >dn ManagedElement=NODE06ST,SystemFunctions=1,Pm=1,PmJob=POT_Thr_Job

  2. Enter Config mode:

    (PmJob=POT_Thr_Job)>configure

  3. Set the PmJob state to STOPPED:

    (config-PmJob=POT_Thr_Job)>requestedJobState=STOPPED

  4. Commit the PmJob configuration:

    (config-PmJob=POT_Thr_Job)>commit

  5. Verify the result:

    (PmJob=POT_Thr_Job)>show -v

    The following is an example output:

    PmJob=POT_Thr_Job
       compressionType=[] <empty>
       currentJobState=STOPPED <read-only>
       granularityPeriod=FIFTEEN_MIN <default>
       jobControl=FULL <default> <read-only>
       jobGroup=[] <empty>
       jobPriority=MEDIUM <default>
       jobType=THRESHOLDJOB
       pmJobId="POT_Thr_Job"
       reportContentGeneration=CHANGED_ONLY <default>
       reportingPeriod=FIFTEEN_MIN <default>
       requestedJobState=STOPPED
       MeasurementReader=POT_mr