| 1 | General |
| 1.1 | Introduction |
| 1.2 | Terms |
| 1.3 | Concept |
| 1.4 | History |
2 | Compliance Lists |
| 2.1 | LM (ITU-T Q.2144) |
3 | Notes |
Reference List | |
1 General
1.1 Introduction
Ericsson AB Layer Management (LM) ITU version R1 is compliant with the ITU-T standard Reference [1] according to the table in this document.
1.2 Terms
| ATM | Asynchronous Transfer Mode | |
| ITU-T | International Telecommunication Union - Telecommunication | |
| LM | Layer Management | |
| NNI | Node Network Interface | |
| SAAL | Signaling ATM Adaptation layer | |
| SoC | Statement of Compliance | |
| SSCF | Service Specific Coordination Functions | |
| SSCOP | Service Specific Connection Oriented Protocol | |
1.3 Concept
This section will explain the different concepts that will be used in the compliance lists. The terms that are used are:
| C | Ericsson module complies with the specified paragraph in the standard. | |
| N | Ericsson module does not comply with the specified paragraph in the standard. | |
| P | Ericsson module complies partly with the specified paragraph in the standard. Specify in a note what in the module that does comply and what that does not. | |
| - | There is nothing to implement in the referred paragraph (used in column “C”). | |
1.4 History
|
Revision |
Date |
Author |
Comment |
|
A |
2002–08–09 |
Mats Jarlstedt |
Approved after document inspection. |
|
B |
2007-02-19 |
XMRALBA |
Converted to XML format |
|
C |
2007-09-27 |
XMREVEF |
Minor changes |
2 Compliance Lists
2.1 LM (ITU-T Q.2144)
|
Reference |
C |
N |
P |
Comments |
|---|---|---|---|---|
|
1 Scope |
- |
|||
|
2 Normative References |
- |
|||
|
2.1 Normative references |
- |
|||
|
2.2 Informative references |
- |
|||
|
3 Abbreviations and acronyms |
- |
|||
|
4 Model for interactions with Layer Management |
- |
|||
|
5 Interface Between Layer Management and the SAAL at the NNI |
- |
|||
|
5.1 Interface Between Layer Management and SSCOP |
X |
|||
|
5.2 Interface Between Layer Management and the SSCF at the NNI |
X |
|||
|
6 State Transition Table of LM for the management of SAAL at NNI |
X |
|||
|
7 Interface to systems management |
X |
|||
|
8 Peer-to-peer Layer Management communication |
X |
|||
|
9 Procedures of Layer Management |
- |
|||
|
9.1 Error processing |
X |
|||
|
9.1.1 Error Monitoring for In-Service Links |
X |
|||
|
9.1.2 Detection of Excessive Time with no Credit |
X |
|||
|
9.1.3 Detection of Closely Spaced SSCOP Recoveries |
X |
|||
|
9.2 Measurements |
X |
|||
|
9.2.1 Duration of presence in In-Service state |
X |
|||
|
9.2.2 Signalling Link Failures |
X |
|||
|
9.2.3 Signalling Link Restoration |
X |
|||
|
9.3 Handling of processor outage conditions |
X |
|||
|
9.4 Management of signalling link proving |
X |
|||
|
Annex A, Real system resources |
- |
|||
|
Appendix I, Management error indications |
- |
|||
|
Appendix II, example of error monitoring of In-Service links |
||||
|
II.1 Overview |
- |
|||
|
II.2 Detailed description |
- |
|||
|
II.3 Rationale for default parameters |
- |
|||
|
II.4 Proving |
- |
|||
|
Figure II.1/Q.2144 |
X |

Contents