vDicos, Diameter Link Failure
C-Diameter

Contents


1   Alarm Description

The alarm is raised when a Diameter connection has failed. Missing connection between one or more Diameter peer nodes can decrease the throughput of messages between Diameter applications.

The alarm is cleared automatically when all configured connections are set up successfully.

The alarm is also cleared automatically in the following situations:

2   Procedure

2.1   Handle Alarm vDicos, Diameter Link Failure

Prerequisites

Steps

  1. Contact the network administrator and verify that a connection can be built between the Own Diameter Node and the Peer Node, that is the Peer is accessible on transport level.
  2. Verify that the local Diameter configuration is consistent and according to the Diameter traffic plan. Verify it against the configuration of the Peer Node.

    Navigate to the DIA-CFG-NeighbourNode MO, and print its configuration, for example:

    >dn ManagedElement=NODE06ST,XyzFunction=xyz,DIA-CFG-Application=DIA,DIA-CFG-StackContainer=abc,DIA-CFG-PeerNodeContainer=abc,DIA-CFG-NeighbourNode=node12.ericsson.com\23abc

    >show all

    Navigate to the DIA-CFG-OwnNodeConfig MO, and print its configuration, for example:

    >dn ManagedElement=NODE06ST,XyzFunction=xyz,DIA-CFG-Application=DIA,DIA-CFG-StackContainer=abc,DIA-CFG-OwnNodeConfig=abc

    >show all

    Replace the key of the DIA MOs with the stackId and hostId values of the alarm instance.

    Note:  
    Printing and verification of the configuration of the Peer Node is outside the scope of this document.

  3. If the connection failure was caused by some transient network fault, the alarm is cleared automatically when the connection is set-up successfully. Is the alarm cleared?

    Yes: Proceed with Step 6.

    No: Continue with the next step.

  4. In case the Peer is accessible from the Own Node and the configuration of both sides are consistent but the connection can not be established, perform data collection, refer to C-Diameter Trouble Report and Support Case Writing Guideline.
  5. Consult the next level of maintenance support. Further actions are outside the scope of this instruction.
  6. Job is completed.