1 Introduction
This document contains the description of tests that can be done as part of the customer acceptance process. For more information, refer to the Customer Acceptance Test Specification.
1.1 Purpose
This document is used for summarizing the results of the customer acceptance test.
2 Test Result Summary
This section lists the test cases.
|
Test Case |
Test |
Comment |
|---|---|---|
|
Health Check, Customer Acceptance Test Specification |
|
|
|
|
||
|
Reboot vCIC in Single Server Deployment, Customer Acceptance Test Specification |
|
|
|
Reboot Region Switch in Single Server Deployment, Customer Acceptance Test Specification |
|
|
|
Reboot Single Server Host with VM Configured, Customer Acceptance Test Specification |
|
|
|
Backup and Restore Atlas in Single Server Deployment, Customer Acceptance Test Specification |
|
|
|
Reboot Compute Host and Recover vFuel, Customer Acceptance Test Specification |
|
|
|
Reboot Compute Host and Recover vCIC, Customer Acceptance Test Specification |
|
|
|
Reboot vCIC Host with Master RabbitMQ Node, Customer Acceptance Test Specification |
|
|
|
Reboot Region Switch in Multi-Server Deployment, Customer Acceptance Test Specification |
|
|
|
Lock or Unlock Blade in a Given Slot, Customer Acceptance Test Specification |
|
|
|
Restart Host Where Atlas Executes, Customer Acceptance Test Specification |
|
|
|
Reboot vCIC in Multi-Server Deployment, Customer Acceptance Test Specification |
|
|
|
Reboot Whole vCIC Cluster, Customer Acceptance Test Specification |
|
|
|
Restart Atlas VM, Customer Acceptance Test Specification |
|
|
|
Reboot VM, Soft, Customer Acceptance Test Specification |
|
|
|
Reboot VM, Hard, Customer Acceptance Test Specification |
|
|
|
VM Stop and VM Start, Customer Acceptance Test Specification |
|
|
|
Backup and Restore Atlas in Multi-Server Deployment, Customer Acceptance Test Specification |
|
|
|
Migrate VM with Nova migrate Command, Customer Acceptance Test Specification |
|
|
|
Migrate VM to Unspecified Host Using Nova forcemove Command, Customer Acceptance Test Specification |
|
|
|
Verify That Migrated vFuel VMs Are Synchronized after CEE Deployment, Customer Acceptance Test Specification |
|
|
|
Verify That Manual vFuel Handover Is Successful, Customer Acceptance Test Specification |
|
|
|
Verify vFuel Image Synchronization Instructions, Customer Acceptance Test Specification |
|
|
|
Verify Rollback to Previous (Passive) vFuel Version, Customer Acceptance Test Specification |
|
|
|
End-to-End Connectivity Using CSS, Customer Acceptance Test Specification |
|
|
|
End-to-End Connectivity Using SR-IOV, Customer Acceptance Test Specification |
|
|
|
End-to-End Connectivity Using PCI PT, Customer Acceptance Test Specification |
|
|
|
Verify IPv6 Address as Allowed Address Pair, Customer Acceptance Test Specification |
|
|
|
Verify IPv6 Ingress Rules, Customer Acceptance Test Specification |
|
|
|
Verify Software RAID Configuration, Customer Acceptance Test Specification |
|
|
|
Check Scale-In Functionality on Compute Hosting vFuel, Customer Acceptance Test Specification |
|
|
|
Check Scale-In Functionality on Compute Hosting vCIC, Customer Acceptance Test Specification |
|
|
Date of test completion: ................................................ | ||
|
Ericsson |
Customer | |
|
Test responsible: |
Test responsible: | |
|
................................................ |
................................................ | |
|
(Name and signature) |
(Name and signature) | |
|
Project manager: |
Project manager: | |
|
................................................ |
................................................ | |
|
(Name and signature) |
(Name and signature) | |