1 Introduction
This document summarizes the complete procedure for deploying a Cloud Execution Environment (CEE) region.
1.1 Prerequisites
This section describes the prerequisites that must be fulfilled before CEE can be installed.
1.2 General Prerequisites
This document covers CEE installation on hardware configurations that are installed according to one of the following documents:
- BSP Installation, Reference [3]
- HDS End-to-End Installation, available as described in Hyperscale Datacenter System 8000 Customer Documentation, Reference [1]
- Installation documents received from supplier
1.2.1 Single Server Prerequisites
The Single Server setup is a small footprint infrastructure version of CEE. It contains one single compute host and one Virtual Cloud Infrastructure Controller (vCIC) installed on it
The Single Server setup does not contain the following:
- Dedicated traffic switches
- Dedicated storage switches
- Dedicated control switches
However, a switch that is not configured by CEE is required for the installation. (It can be a budget switch and configuration has to performed manually.)
This switch must be capable of the following:
- Configuring the required VLANs (refer to your local version of the IP and VLAN plan, Reference [2], updated with site-specific IP addresses) to perform the installation from the kickstart server.
- Configuring NTP
- Configuring SNMPv3
After configuring the switch, it has to be connected to the following system elements for the single server CEE installation:
- Kickstart server
- Control network interface of the Dell compute server
- iDRAC interface of the Dell compute server
1.3 HW-Specific Prerequisites
For the hardware-specific prerequisites, refer to the prerequisites in each individual procedure for the deployment, as indicated in Table 1.
|
BSP |
Dell |
HDS |
Other |
Dell | |
|---|---|---|---|---|---|
|
Yes |
Yes |
Yes |
Yes | ||
|
Yes |
Yes, or supplier documents for installation and configuration of Control Switches |
||||
|
Yes |
Yes, or supplier documents for installation and configuration of Switches for Traffic and Storage Network |
||||
|
Yes |
Yes |
Yes |
Yes |
||
|
Yes |
Yes |
Yes |
Yes |
Yes | |
|
Yes |
Yes |
Yes |
Yes | ||
|
OpenStack Networking API in CEE in Dell Multi-Server Deployment |
Yes |
Yes |
|||
|
Yes |
Yes |
Yes |
Yes |
Yes | |
|
Yes |
Yes |
Yes |
Yes |
Yes | |
|
Yes |
Yes |
Yes |
Yes |
Yes | |
|
Yes |
Yes |
Yes |
Yes |
||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Yes |
|||||
|
Configure Northbound Interface in BSP, Reference [11] |
Yes |
||||
|
Yes |
|||||
|
Yes |
Yes | ||||
|
Yes |
Yes | ||||
|
Yes | |||||
|
Yes | |||||
|
Yes | |||||
|
Yes | |||||
|
Hyperscale Datacenter System 8000 Customer Documentation, Reference [1] |
Yes |
||||
|
Yes |
|||||
|
Yes |
2 Installation Flow for Multi-Server Deployments
This section describes the complete installation procedure for multi-server CEE deployments.
Multi-server CEE deployments consist of the following parts:
- Data Center Gateways (DC-GWs)
- Firewalls
- Traffic Switches
- Control Switches
- Storage Switches
- Storage System
- Compute hosts
In most cases, two units are used to achieve redundancy.
For the installation of multi-server CEE, depending on the deployed hardware environment, follow the relevant procedure:
- For installation of multi-server CEE on BSP hardware, see Section 2.1.
- For installation of multi-server CEE on Dell hardware, see Section 2.2.
- For installation of multi-server CEE on HDS vPOD, see Section 2.3.
The general installation flow of multi-server CEE consists of the following steps:
- Creating site-specific configuration file to be used
during the SW installation by following the instructions in Configuration File Guide
- Note:
- The configuration file must be in place since data needs to be consistent.
- Installation of CEE hardware according to the supplier documents
- Preparation to install and configuration of the Control Switches
- Preparation to install and configuration of the Switches for Traffic and Storage Network
- Installation of the Storage system
- Note:
- This step is optional.
- Configuration of the Server System, including the following elements:
- Installation and configuration of a kickstart server according to Preparation of Kickstart Server
- Installation of SW according to the instructions in SW Installation in Multi-Server Deployment
- Performing the post-installation activities, see Section 4
2.1 Multi-Server CEE Installation on BSP Hardware
This section describes multi-server installation on BSP hardware.
The server, storage, and switching components of the hardware environment are shown in Figure 1fig_BSP_SIO_eps.
Follow the below steps for installation:
- Create site-specific configuration file to be used during
the SW installation by following the instructions in Configuration File Guide.
- Note:
- The configuration file must be in place since data needs to be consistent.
- Install CEE hardware according to BSP Hardware Installation, see Reference [12].
- Configure the Server System according to the instructions
in BSP Initial Configuration, Reference [10].
By using the BSP instruction Add Shelf, Reference [8], add all the shelves that contain blades to be part of the CEE region to the BSP.
- Note:
- If GEP7 blades are used, CEE can only be deployed if the
firmware of the Ethernet interfaces are updated to version 5.04 or
later on all GEP7 blades. GEP7 boards ordered after mid-September
2016 are delivered with firmware version 5.04. GEP7 boards ordered
before mid-September 2016 must be sent back to the manufacturer for
firmware update.
If GEP7L blades are used, ensure that all blades have the following software versions:
- Install and configure a kickstart server according to Preparation of Kickstart Server.
- Install SW according to the instructions in SW Installation in Multi-Server Deployment.
- Perform the post-installation activities, see Section 4.
2.2 Multi-Server CEE Installation on Dell Hardware
This section describes multi-server installation on Dell hardware.
The server, storage, and switching components of the HW environment with ScaleIO Storage solution are shown in fig_Dell_SIO_eps Figure 2.
Figure 2 CEE System on Dell HW, ScaleIO
Figure 2 CEE System on Dell HW, ScaleIO
Follow the below steps for installation:
- Create site-specific configuration file to be used during
the SW installation by following the instructions in Configuration File Guide.
- Note:
- The configuration file must be in place since data needs to be consistent.
- Install CEE hardware according to Dell PowerEdge R630 HW Installation.
- Prepare to install and configure the Control Switches by following the instructions in Extreme X460 Configuration.
- Prepare to install and configure the Switches for Traffic and Storage Network by following the instructions in Extreme X770 Configuration.
- Configure the Server System according to the instructions in Dell PowerEdge R630 Server Configuration and Dell PowerEdge R630 Server BIOS Configuration for CEE.
- Install and configure a kickstart server according to Preparation of Kickstart Server.
- Install SW according to the instructions in SW Installation in Multi-Server Deployment.
- Perform the post-installation activities, see Section 4.
2.3 Multi-Server CEE Installation on HDS vPOD
This section describes multi-server installation on an HDS Virtualized Performance Optimized Datacenter (vPOD).
The server, storage, and switching components of the environment are shown in fig_HDS_eps Figure 3.
The server, storage, and switching components of the environment with ScaleIO Storage solution are shown in fig_HDS_SIO_eps Figure 4.
Follow the below steps for installation:
- If required, install and configure HDS hardware according to the End-to-End Installation Guide document of Hyperscale Datacenter System 8000 Customer Documentation, Reference [1].
- Create and configure vPOD for the
CEE region, and assign compute to the vPOD, according to Multi-Server System Dimensioning Guide, CEE 6 and Hyperscale Datacenter System 8000 Customer Documentation, Reference [1].
If applicable, note down the output of vPOD creation to use in Step 3. For more information, refer to the Configuration File Guide.
- Note:
- If you are a DC customer, order a vPOD from the DC owner with the required capacity planned in accordance with Multi-Server System Dimensioning Guide, CEE 6.
- Create site-specific configuration
file to be used during the SW installation by following the instructions
in Configuration File Guide and, if applicable, using the output of vPOD creation and configuration
in Step 2.
- Note:
- The configuration file must be in place since data needs to be consistent.
- Perform CEE installation on the vPOD as described in CEE on HDS Installation, including the
following:
- Preparation of the kickstart server
- Configuration of networks
- Deployment of CEE
- Perform the post-installation activities, see Section 4.
3 Installation Flow for Single Server Deployments
This section describes the complete installation procedure for single server CEE deployments.
Single server CEE deployments consist of the following parts:
- One compute blade hosting:
No redundancy or high availability is provided.
3.1 Single Server CEE Installation on Dell Hardware
This section describes single server installation on Dell hardware.
Figure 4 CEE System on Dell HW
Figure 5 CEE System on Dell HW
Follow the below steps for installation:
- Create site-specific configuration file to be used during
the SW installation by following the instructions in Configuration File Guide.
- Note:
- The configuration file must be in place since data needs to be consistent.
- Install CEE hardware according to the supplier documents.
- Configure the Server System according to the instructions in Dell PowerEdge R630 Server Configuration and Dell PowerEdge R630 Server BIOS Configuration for CEE.
- Install and configure a kickstart server according to Preparation of Kickstart Server.
- Install SW according to the instructions in SW Installation in Single Server Deployment.
- Perform the post-installation activities, see Section 4.
4 Post-Installation Activities
This section describes the post-installation activities needed for CEE.
Do the following:
- Configure alarm destinations by following the instructions in Fault Management Configuration Guide.
- Set up the firewall according to the recommendations in DC Firewall Hardening Guide.
- Perform system hardening by following the instructions in System Hardening Guideline.
- Configure external connections by following the instructions
in the user guide relevant to the CEE hardware deployment:
- OpenStack Networking API in CEE in Dell Multi-Server Deployment
- OpenStack Networking API in CEE in BSP Deployment
- Note:
- For the configuration of the Northbound Interface (NBI) on BSP, refer to Configure Northbound Interface in BSP, Reference [11].
- OpenStack Networking API in CEE in Single Server Deployment
- OpenStack Networking API in CEE with SDN
- Install CEE management software by following the instructions in Atlas SW Installation.
- In case of single server deployment, disable Atlas by following the instructions in Atlas On Demand Use.
- For disaster recovery purposes, fetch vFuel image and
copy the backup to another storage place out of scope of CEE. To identify
the location of the vFuel image within the CEE region, refer to the
document Fuel Synchronization.
Fuel Synchronization is not possible for single-server deployments of CEE.
- In case of single server deployment, disable vFuel by
following the instructions in vFuel On Demand Use.
vFuel runs on the kickstart server in single server deployments and is not migrated to the CEE region. This vFuel is specific to a single deployment and cannot be used across multiple installations.
- Execute health check according to Health Check Procedure.

Contents