| 1 | Introduction |
| 1.1 | Alert Description |
| 1.2 | Prerequisites |
2 | Procedure |
| 2.1 | Actions |
1 Introduction
This instruction concerns the handling of an alert that requires intervention.
1.1 Alert Description
The Complete CIC Service Restarted alert is issued for a region by the Managed Object (MO) CtrlDomain when the periodic uptime measurements show that the uptime for all three virtual Cloud Infrastructure Controllers (vCICs) has decreased, which means that all vCICs have been simultaneously unavailable.
- Note:
- Since the Complete CIC Service Restarted alert already includes the information that each vCIC node has been restarted, the CIC Restarted alert is not issued for the individual vCIC nodes in this case.
The severity of the alert is WARNING.
The alert attributes are listed in Table 1.
|
Attribute Name |
Attribute Value |
|---|---|
|
Major Type |
193 |
|
Minor Type |
2031671 |
|
Managed Object Class |
CtrlDomain |
|
Managed Object Instance |
Region=<name_of_the_region>, |
|
Specific Problem |
Complete CIC Service Restarted |
|
Event Type |
other (1) |
|
Probable Cause |
m3100Indeterminate(0) |
|
Additional Text |
N/A |
|
Severity |
WARNING (6) |
1.2 Prerequisites
This section provides information on the documents, tools, and conditions that apply to the procedure.
1.2.1 Documents
Not applicable.
1.2.2 Tools
No tools are required.
1.2.3 Conditions
Before starting this procedure, ensure that the alert was not issued due to ongoing planned maintenance. If the alert was issued due to ongoing planned maintenance, no further actions are required.
2 Procedure
This section describes the procedure to follow when this alert is received.
2.1 Actions
Perform the following:
- Inspect the host: if there are other alerts or alarms
issued for the host, resolve them.
For more information, refer to the relevant alarm OPI document.
- Inspect the system: if there are other alerts or alarms
present in the system, perform a health check.
For more information, refer to Health Check Procedure.
- If the alert is issued due to a planned CIC service restart,
exit this procedure.
If the alert is not issued due to a planned CIC service restart, underlying hardware problems can be causing the alert. In this case, collect troubleshooting data as described in the Data Collection Guideline.
- Contact the next level of maintenance support. Further actions are outside the scope of this instruction.
- The job is completed.

Contents